ENS 42822

From kanterella
Jump to navigation Jump to search
ENS 42822 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-2.45 h-0.102 days <br />-0.0146 weeks <br />-0.00336 months <br />)
Opened: Michael Kennedy
18:42 Aug 31, 2006
NRC Officer: Jason Kozal
Last Updated: Aug 31, 2006
42822 - NRC Website