eee Flrrida Power RaEa^LT M 4if.a.',
own SAFEGUARDS INFORMATION July 8,1999 3F0799-03 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Safeguards Contingency Plan, Revision 5-0
Dear Sir:
Pursuant to the provisions of 10 CFR 50.54(p), Florida Power Corporation (FPC) is hereby submitting Revision 5-0, to the Crystal River Unit 3 (CR-3) Safeguards Contingency Plan (SCP).
This submittal replaces the current revision to the CR-3 SCP, Revision 4, in its entirety. These changes do not decrease the safeguards effectiveness of the plan or its implementation.
This Safeguards Information document is appropriately designated and, as such, shall be withheld from public disclosure and protected in accordance with 10 CFR 73.21.
Sincerely, MMA John Paul Cowan ENCLOSURE CONTAINS JUARDS Vice President INFORMATION. UPON SEPARATION MS PAGEIS DECONOMD.
Nuclear Operations JPC:ff Enclosure xc:
Regional Administrator, Region II (w/o Enclosure)
Senior Resident Inspector (w/ Enclosure)
NRR Project Manager (w/o Enclosure) 9907140174 990708 1
PDR ADOCK 05000302 J
s F
PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street
- Crystal River, Florida 34428-6708 + (352)795-6486 A Florlds Progress Corr,pany
- "" "^" " ' " " " " ^ * "
140029