Pages that link to "Twarog J"
← Twarog J
Jump to navigation
Jump to search
The following pages link to Twarog J:
Displayed 19 items.
- W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 (← links)
- W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation (← links)
- W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days (← links)
- ML24159A267 (← links)
- W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 (← links)
- W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 (← links)
- W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 2023 (← links)
- W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure (← links)
- W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 (← links)
- ML24115A088 (← links)
- ML24115A086 (← links)
- W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 (← links)
- W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 (← links)
- 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike (← links)
- 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test (← links)
- 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure (← links)
- 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure (← links)