Pages that link to "RS-20-130, License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled Condition"
Jump to navigation
Jump to search
The following pages link to RS-20-130, License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled Condition:
Displayed 50 items.
- ML16074A424 (← links)
- ML15272A307 (← links)
- ML15267A783 (← links)
- ML14164A061 (← links)
- ML14164A060 (← links)
- ML111790037 (← links)
- ML111790035 (← links)
- ML111790032 (← links)
- ML18065A204 (← links)
- ML18053A180 (← links)
- ML18053A168 (← links)
- ML18053A167 (← links)
- RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements (← links)
- RS-16-060, EP-AA-1002, Addendum 3, Revision 1, Emergency Action Levels for Byron Station. (← links)
- RS-16-060, Byron, Units 1 and 2 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision (← links)
- RA-14-032, Byron, Units 1 and 2, Attachment 3, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1002, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosures 3B, 3C, by 3-75 - by 3-157 (← links)
- RA-14-032, Byron, Units 1 and 2, Attachment 3, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1002, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosures 3A, 3B, Cover - by 3-74 (← links)
- RS-14-096, Braidwood & Byron, Units 1 and 2 - License Amendment Request to Administratively Clarify Technical Specifications (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instr (← links)
- ML081780131 (← links)
- NEI 99-01, Byron, Units 1 and 2, Attachment 3, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1002, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosures 3B, 3C, by 3-75 - by 3-157 (← links)
- NEI 99-01, Byron, Units 1 and 2, Attachment 3, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1002, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosures 3A, 3B, Cover - by 3-74 (← links)
- RS-15-174, Revisions to Byron and Braidwood Stations, Units 1 and 2 License Renewal Application and Byron Station Applicant'S Environmental Report, Sections 3.1.3, 3.1 .3.1 and 4.1 (← links)
- RS-15-093, Second 10 CFR 54.21 (B) Annual Amendment to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-169, Responses to NRC Requests for Additional Information, Set 27, Dated May 21, 2014, and Correction of Previously Submitted Information Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Applica (← links)
- RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (← links)
- RS-18-027, License Amendment Request to Utilize Accident Tolerant Fuel Lead Test Assemblies (← links)
- RS-16-249, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy (← links)
- RS-18-102, License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.2 (← links)
- RS-14-285, License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink(Uhs) (← links)
- RS-12-212, 10 CFR 50 Appendix E Evacuation Time Estimate Analysis (← links)
- RS-10-030, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-09-121, License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time (← links)
- RS-09-054, License Amendment Request Regarding Ultimate Heat Sink (← links)
- RS-18-149, Supplemental Information Related to License Amendment Request for a One-Time Extension to Technical Specification 3.8. 1, AC Sources-Operating, Required Action A.2 (← links)
- ML19036A586 (← links)
- RS-19-022, License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs) (← links)
- RS-18-035, License Amendment Request to Revise Technical Specification 3.2.3, Axial Flux Difference (← links)
- RS-17-123, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. (← links)
- RS-17-058, License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements. (← links)
- RS-17-081, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification (← links)
- RS-16-034, License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding (← links)
- RS-19-018, Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times (← links)
- RS-19-008, Application for Technical Specifications Change to Add LCO 3.0.9 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (← links)
- RS-17-170, Company Emergency Plan Annex and Addendum Revisions (← links)
- RS-17-011, License Amendment Request to Delete Obsolete License Conditions and Revise Technical Specifications (← links)
- RS-14-337, Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-14-336, Units 1 and 2 - Supplemental Commitment Related to the October 31, 2014 Response to NRC Request for Additional Information, Set 42, Dated October 10, 2014, Related to License Renewal Application (← links)
- RS-14-222, License Amendment Request to Revise Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel (← links)
- RS-14-096, Units 1 and 2 - License Amendment Request to Administratively Clarify Technical Specifications (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation (← links)
- RS-14-080, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)- 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. (← links)