Pages that link to "ML093200206"
Jump to navigation
Jump to search
The following pages link to ML093200206:
Displayed 25 items.
- HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme (← links)
- RA-18-0204, Transmittal of Technical Specification Bases (← links)
- HNP-16-066, License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report (← links)
- HNP-16-068, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement (← links)
- HNP-16-064, Transmittal of Technical Specification Bases (← links)
- HNP-15-038, License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change (← links)
- HNP-15-086, License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement (← links)
- HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- HNP-15-046, Transmittal of Technical Specifications Bases (← links)
- HNP-14-050, Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process (← links)
- HNP-11-097, Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information (← links)
- HNP-12-130, Transmittal of Technical Specifications Bases (← links)
- HNP-10-006, Request for License Amendment Proposed Revision to Technical Specification 3.6.2.2.a, Surveillance Requirement 4.6.2.2.d and Associated TS Bases to Incorporate an Expanded Range of Eductor Flow Rates (← links)
- RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type (← links)
- RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies (← links)
- RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications (← links)
- HNP-04-151, Technical Specification Bases Change: Undervoltage and Underfrequency - Reactor Coolant Pump Buses (← links)
- HNP-03-015, TS Bases Change - Containment Isolation Valves (← links)
- RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System (← links)
- RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications (← links)
- RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes (← links)
- ML20147A040 (← links)
- ML20147A033 (← links)
- RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process (← links)