ENS 49888: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/10/2014 16:28 EDT | | event date = 03/10/2014 16:28 EDT | ||
| last update date = 03/10/2014 | | last update date = 03/10/2014 | ||
| title = Reactor Scram Due | | title = Reactor Scram Due to Actuation of the Alternate Rod Insertion System | ||
| event text = At 1628 EDT Nine Mile Point (NMP) Unit 2 experienced an actuation of the Alternate Rod Insertion (ARI) system which resulted in a reactor scram. Coincident with the scram, the Reactor Core Isolation Cooling (RCIC) system initiated. | | event text = At 1628 EDT Nine Mile Point (NMP) Unit 2 experienced an actuation of the Alternate Rod Insertion (ARI) system which resulted in a reactor scram. Coincident with the scram, the Reactor Core Isolation Cooling (RCIC) system initiated. | ||
Prior to the event, maintenance personnel were working in the vicinity of a reactor vessel level instrumentation rack and may have agitated the common drain line of the transmitters. A prompt investigation is underway to investigate the incident. | Prior to the event, maintenance personnel were working in the vicinity of a reactor vessel level instrumentation rack and may have agitated the common drain line of the transmitters. A prompt investigation is underway to investigate the incident. |
Latest revision as of 21:51, 1 March 2018
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-1.13 h-0.0471 days <br />-0.00673 weeks <br />-0.00155 months <br />) | |
Opened: | Ryan Hamilton 19:20 Mar 10, 2014 |
NRC Officer: | Daniel Mills |
Last Updated: | Mar 10, 2014 |
49888 - NRC Website | |