Pages that link to "W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal"
Jump to navigation
Jump to search
The following pages link to W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal:
Displayed 24 items.
- W3F1-2023-0049 (redirect page) (← links)
- ML23271A178 (redirect page) (← links)
- ML23340A233 (← links)
- ML23340A229 (← links)
- W3F1-2023-0055, Reply to a Notice of Violation (← links)
- ML23340A233 (← links)
- ML23340A229 (← links)
- W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 (← links)
- W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation (← links)
- W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program (← links)
- W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 (← links)
- W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 (← links)
- W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 2023 (← links)
- W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure (← links)
- W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 (← links)
- W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 (← links)
- W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles (← links)
- W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (← links)
- W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/2023004 (← links)
- W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles (← links)
- W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (← links)
- W3F1-2024-0041, Reply to a Notice of Violation, EA-24-052 (← links)
- W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable (← links)
- W3F1-2024-0049, Notification of Readiness for Supplemental Inspection (← links)