Pages that link to "RIS 2009-02, Rev 1, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors"
Jump to navigation
Jump to search
The following pages link to RIS 2009-02, Rev 1, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors:
Displayed 15 items.
- RIS 2003-15, NRC Regulatory Issue Summary, Consolidation of Region I & Region II Materials Program. (← links)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities At Proposed, Unlicensed Uranium Recovery Facilities (← links)
- RIS 2009-10, Communications Between the NRC and Reactor Licensees During Emergencies and Significant Events (← links)
- RIS 2009-07, Status Update for Implementation of NRC Regulatory Authority for Certain Naturally Occurring and Accelerator-Produced Radioactive Material (← links)
- RIS 2009-08, Process for Test Controls Associated with Performing Initial Validity Tests and Drug Tests Described in 10 CFR Part 26, Subpart F (← links)
- RIS 2009-14, Licensing Approach for In-Situ Recovery Facility Application Scenarios (← links)
- RIS 2009-02, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... (← links)
- RIS 2009-09, Withdrawn NRC Regulatory Issue Summary 2009-09: Use of Multiple Dosimetry and Compartment Factors in Determining Effective Dose Equivalent from External Radiation Exposures (← links)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities at Proposed, Unlicensed Uranium Recovery Facilities (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium in Situ Recovery ... (← links)
- RIS 2002-22, 2018/05/31 NRR E-mail Capture - [External Sender] 5/23/18 Meeting, NEI Input the Draft RIS 2002-22, Supplement 1 Which Provides Clarification on the Endorsement of NEI Guidance in Designing Digital Upgrades in Instrumentation and Control (← links)
- RIS 2009-02, Public Meeting Announcement Re Revision to RIS 2009-02 (← links)
- RIS 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels (← links)
- RIS 2009-06, OMB 3150-XXXX, Draft Supporting Statement for NRC Regulatory Issue Summary 2009-06, Revision 1, Importance of Giving the NRC Advance Notice of Intent to Pursue License Renewal (← links)