Pages that link to "RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report"
Jump to navigation
Jump to search
The following pages link to RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report:
Displayed 34 items.
- ML110330085 (← links)
- RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report (← links)
- RNP-RA/14-0061, Submittal of Snubber Examination and Testing Program (← links)
- RNP-RA/14-0040, Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) (← links)
- RNP-RA/12-0119, Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... (← links)
- RNP-RA/12-0056, Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval (← links)
- RNP-RA/10-0091, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/15-0063, Submittal of Ninety Day Inservice Inspection Summary Report - Supplement (← links)
- RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RA-19-0094, Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval (← links)
- RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report (← links)
- RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report (← links)
- RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report (← links)
- RNP-RA/12-0067, Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval (← links)
- RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/12-0064, Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- RNP-RA/12-0017, Inservice Testing Program Plan for the Fifth-Ten Year Interval (← links)
- RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 (← links)
- RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results (← links)
- RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head (← links)
- RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections (← links)
- RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements (← links)
- RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program (← links)
- ML020570311 (← links)
- RA-19-0393 (redirect page) (← links)
- ML21067A789 (redirect page) (← links)
- RA-21-0056, Refueling Outage 32 Steam Generator Tube Inspection Report (← links)
- RA-20-0329, Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers (← links)
- RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval (← links)
- RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations (← links)