Pages that link to "NL-16-2513, Response to Follow-up Request for Information Regarding Reactor Pressure Vessel Threads-in-Flange Examination Requirement"
Jump to navigation
Jump to search
The following pages link to NL-16-2513, Response to Follow-up Request for Information Regarding Reactor Pressure Vessel Threads-in-Flange Examination Requirement:
Displayed 50 items.
- ML17006A109 (← links)
- ML16328A374 (redirect page) (← links)
- ML17006A109 (← links)
- ML16308A401 (← links)
- ML16256A221 (← links)
- ML16224A143 (← links)
- ML16204A042 (← links)
- ML16214A025 (← links)
- CAC:MF8061 (← links)
- NL-16-2513 (redirect page) (← links)
- NL-15-2130, Responds to Request for Additional Information for Proposed Inservice Inspection Alternative FNP-ISI-ALT-18, Version 1.0 (← links)
- NL-17-1367, Response to the Second Request for Additional Information Regarding Alternative Source Term License Amendment Request (← links)
- NL-17-0480, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information (← links)
- NL-17-0774, Response to Request for Information Regarding License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems - Operating (← links)
- NL-16-0724, Proposed Lnservice Inspection Alternative VEGP-ISI-ALT-11, Version 1.0 (← links)
- NL-16-0572, Response to Request for Additional Information Regarding TSTF-432-A, Revision 1 (← links)
- NL-16-0098, Response to Request for Additional Information for Adoption of Technical Specifications Task Force Traveler 312 (← links)
- NL-15-2222, Response to Request for Additional Information for RHR Autoclosure Interlock Function Elimination LAR (← links)
- NL-15-1814, Response to Request for Additional Information Regarding Multiple Technical Specifications Changes (← links)
- NL-15-1761, Response to Request for Additional Information Regarding Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294) (← links)
- NL-15-1665, Response to Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 2 (← links)
- NL-17-2135, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program, Response to NRC Request for Additional Information (← links)
- NL-17-1067, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (← links)
- NL-17-0643, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (← links)
- NL-17-0613, Response to Request for Additional Information Regarding Alternative Request FNP-ISI-ALT-20, Version 1.0, Regarding System Leakage Test (← links)
- NL-17-0512, Response to Request for Additional Information Regarding Alternative Request RR-PR-03 Version 1.0 for the Lnservice Testing Program Fifth 1 0-Year Interval (← links)
- NL-16-0723, Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 1.0 (← links)
- NL-16-0415, Response to Request for Additional Information for TS 3.3.5 Loss of Power Diesel Generator Start Instrumentation LAR (← links)
- NL-15-1631, Response to Request for Additional Information for 2R23 Steam Generator Tube Inspection Report (← links)
- NL-17-1443, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Final Response to NRC Requests for Additional Information (← links)
- NL-16-2513, Unit 1 - Response to Follow-up Request for Information Regarding Reactor Pressure Vessel Threads-in-Flange Examination Requirement (redirect page) (← links)
- NL-16-0784, Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-001 (← links)
- NL-16-0870, Units 1 and 2 Supplement to Response to Request for Additional Information for TS 3.3.5 Loss of Power Diesel Generator Start Instrumentation LAR (← links)
- NL-19-0307, Response to NRC Request for Additional Information on Relief Request FNP-ISI-RR-02 (← links)
- NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0 (← links)
- NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) (← links)
- NL-19-0343, Relief Request FNP-ISI-RR-03: SNC Response to NRC Request for Additional Information (← links)
- NL-19-0676, Proposed Alternative FNP-ISI-ALT-05-04, Response to NRC Request for Additional Information (← links)
- NL-20-0403, Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage (← links)
- NL-20-0458, Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (← links)
- NL-20-0550, Responses to NRC Requests for Additional Information License Amendment Request to Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint (← links)
- NL-20-0636, Third Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (← links)
- NL-20-0538, Second Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (← links)
- NL-20-0816, Response to Request for Clarification Regarding the Refueling Outage 1R29 Steam Generator Tube Inspection Report (← links)
- NL-21-0019, Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (← links)
- NL-21-0020, Final Supplemental Response to NRC Generic Letter 2004-02 (← links)
- NL-21-1060, Units 1 and 2, Response to Request for Additional Information Related to License Amendment Request to Allow Elimination of the Encapsulation Vessels Around the First Containment Spray (CS) and Residual Heat Removal . (← links)
- NL-22-0361, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak. (← links)
- NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. (← links)
- NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 (← links)
- NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 (← links)