Pages that link to "ML20235S064"
Jump to navigation
Jump to search
The following pages link to ML20235S064:
Displayed 42 items.
- ML20076M335 (← links)
- ML20244C864 (← links)
- ML20238E979 (← links)
- ML20236N059 (← links)
- ML20236H316 (← links)
- TAC:65852 (← links)
- TAC:45357 (← links)
- B12648, Proposed Tech Specs,Changing Limiting Condition for Operation 3.4.6.2(c) on Page 3/4 4-9 from 0.5 Gpm to 0.15 Gpm for Any One Steam Generator (← links)
- B12630, Proposed Tech Specs,Adding New Surveillance Requirement Re Control Room Habitability (← links)
- B12620, Proposed Tech Specs,Revising Page 6-19 to Add or Reclose to Requirements for Submittal of Annual Repts (← links)
- B12568, Application for Amend to License DPR-65,adding Requirement That Annual Rept Submitted to NRC Must Include Documentation of All Failures & Challenges to Pressurizer PORV or Safety Valve.Application Submitted Per 870615 Commitment.Fee Paid (← links)
- A06182, Responds to 861029 Request for util-proposed Tech Spec Changes Re Reporting of Safety Valve & Relief Valve Failure & Challenges,Control Room Habitability & Secondary Water Chemistry.Schedule for Submittal of Amend Requests Encl (← links)
- B11284, Advises That Due to Extended Outage in Late 1983,1984 Refueling Outage Will Not Occur.Next Scheduled Refueling Outage Will Occur in Feb 1985.All Mods Scheduled for Completion Prior to Startup Following 1985 Outage (← links)
- TAC:54741 (← links)
- A03719, Provides Info for Resolution of Open Items in Amend 89 to License DPR-65 Re Repair of Degraded Steam Generator Tubes by Combining Current Repair Method of Plugging Tubes W/New Method of Installing Metal Tubes (← links)
- TAC:49741 (← links)
- A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17 (← links)
- ML20054F873 (← links)
- ML20236S367 (← links)
- ML20236S363 (← links)
- A02376, Responds to 820318 Request for Addl Info Required to Complete Review of NUREG-0737,Item I.A.1.2 Re Upgraded Senior Reactor Operator & Reactor Operator Training & Item II.B.4 Re Training for Mitigating Core Damage (← links)
- ML20050C507 (← links)
- A02281, Comments on 820208 Review Results of TMI Action Plan Items I.A.1.3 Re Shift manning,I.C.5 Re Procedure for Feedback of Operating Experience to Plant Staff & I.C.6 Re Procedures to Verify Performance of Operating Activities (← links)
- ML20049J167 (← links)
- ML20041B070 (← links)
- ML20041B069 (← links)
- ML20041B066 (← links)
- ML20041B064 (← links)
- ML20041B062 (← links)
- ML20041B060 (← links)
- ML20031F894 (← links)
- ML20028E427 (← links)
- ML20010A692 (← links)
- ML20008F134 (← links)
- ML19345E125 (← links)
- ML19344E083 (← links)
- ML19344E075 (← links)
- ML19344E073 (← links)
- A00938, Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program (← links)
- A01194, Responds to NRC Re Interim Criteria for Shift Staffing.Util Commits to Having Two Licensed Senior Reactor Operators,Two Licensed Reactor Operators & Min of Two Auxiliary Operators at Each Operating Reactor by 820701 (← links)
- A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted (← links)
- ML19309B843 (← links)