Pages that link to "LR-N17-0044, Enclosure 13 of LR-N17-0044 and LAR H17-03 - Affidavits from Cameron International Corporation Supporting the Withholding of Information in Enclosures 9 and 11 from Public Disclosure"
Jump to navigation
Jump to search
The following pages link to LR-N17-0044, Enclosure 13 of LR-N17-0044 and LAR H17-03 - Affidavits from Cameron International Corporation Supporting the Withholding of Information in Enclosures 9 and 11 from Public Disclosure:
Displayed 44 items.
- ML17188A269 (← links)
- ML17188A268 (redirect page) (← links)
- ML17188A269 (← links)
- ML17188A262 (← links)
- ML17188A267 (← links)
- ML17188A260 (← links)
- ML17188A265 (← links)
- LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings (← links)
- LR-N17-0044, Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 (← links)
- LR-N17-0044, Enclosure 13 of LR-N17-0044 and LAR H17-03 - Affidavits from Cameron International Corporation Supporting the Withholding of Information in Enclosures 9 and 11 from Public Disclosure (← links)
- LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) (← links)
- LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve (← links)
- LR-N17-0044, Enclosure 7 to LR-N17-0044 and LAR H17-03 - Affidavits from GEH and the Electric Power Research Institute (EPRI) Supporting the Withholding of Information in Enclosure 6 from Public Disclosure (← links)
- LR-N17-0044, Hope Creek - License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate (← links)
- LR-N16-0113, GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure (← links)
- LR-N08-0224, Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit (← links)
- ML083100827 (← links)
- LR-N06-0192, Guaranteed Retrospective Premiums Following Nuclear Accident, Salem and Hope Creek (← links)
- LR-N16-0202, PSEG Nuclear LLC (PSEG) - Board Resolutions - Foreign Ownership, Control, or Influence (← links)
- LR-N19-0015, Core Operating Limits Report, Reload 21, Cycle 22, Revision 15 (← links)
- LR-N18-0055, Attachment 3 to LR-N18-0055, Affidavit for Core Operating Limits Report for Unit 1 (← links)
- LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate (← links)
- LR-N17-0126, Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application (← links)
- LR-N16-0204, Affidavit for Core Operating Limits Report, Reload 20, Cycle 21, Revision 13 (← links)
- LR-N15-0071, Core Operating Limits Report, Reload 18, Cycle 19, Revision 10 (← links)
- LR-N14-0157, PSEG Nuclear (PSEG) Response to NRC Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request, Dated May 5, 2014 (← links)
- LR-N12-0075, Core Operating Limits Report, Reload 16, Cycle 17, Revision 6 (← links)
- LR-N11-0087, 2011 Annual Report - Guarantees of Payment of Deferred Premiums (← links)
- LR-N08-0029, Transmittal of Proprietary Report 07-17P, Revision 3, Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Model. (← links)
- LR-N08-0028, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N08-0014, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N07-0215, Supplement to License Amendment Request for Extended Power Uprate (← links)
- LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate (← links)
- LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N05-0247, Stations - Guaranteed Retrospective Premiums Following a Nuclear Accident (← links)
- LR-N19-0074, Core Operating Limits Report, Reload 21, Cycle 22, Revision 16 (← links)
- LR-N05-0448, Response to Request for Additional Information Re Request for Change to Technical Specifications Arts/Mellla Implementation (← links)
- LR-N19-0101, Submittal of Core Operating Limits Report, Reload 22, Cycle 23, Revision 17 (← links)
- ML041900426 (← links)
- LR-N03-0386, Transmittal of Information Relating to SVEA-96+ Modeling Dimensions in Support of the Nrc'S Review of GNF-A Proprietary Report, NEDC-33107P, GEXL80 Correlation for SVEA96+ Fuel, Dated September 2003 (← links)
- LR-N20-0023, License Amendment Request: Revise Hope Creek Generating Station Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (← links)
- LR-N21-0042, Core Operating Limits Report, Reload 23, Cycle 24, Revision 21 (← links)
- LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication (← links)
- LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication (← links)
- LR-N22-0083, Enclosure 3 - Global Nuclear Fuel - Americas Affidavit of Lukas Trosman (← links)
- ML17188A262 (← links)
- ML17188A267 (← links)
- ML17188A260 (← links)
- ML17188A265 (← links)
- LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings (← links)
- LR-N17-0044, Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 (← links)
- LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) (← links)
- LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve (← links)
- LR-N17-0044, Enclosure 7 to LR-N17-0044 and LAR H17-03 - Affidavits from GEH and the Electric Power Research Institute (EPRI) Supporting the Withholding of Information in Enclosure 6 from Public Disclosure (← links)
- LR-N17-0044, Hope Creek - License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate (← links)
- LR-N16-0113, GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure (← links)
- LR-N08-0224, Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit (← links)
- ML083100827 (← links)
- LR-N06-0192, Guaranteed Retrospective Premiums Following Nuclear Accident, Salem and Hope Creek (← links)
- LR-N16-0202, PSEG Nuclear LLC (PSEG) - Board Resolutions - Foreign Ownership, Control, or Influence (← links)
- LR-N19-0015, Core Operating Limits Report, Reload 21, Cycle 22, Revision 15 (← links)
- LR-N18-0055, Attachment 3 to LR-N18-0055, Affidavit for Core Operating Limits Report for Unit 1 (← links)
- LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate (← links)
- LR-N17-0126, Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application (← links)
- LR-N16-0204, Affidavit for Core Operating Limits Report, Reload 20, Cycle 21, Revision 13 (← links)
- LR-N15-0071, Core Operating Limits Report, Reload 18, Cycle 19, Revision 10 (← links)
- LR-N14-0157, PSEG Nuclear (PSEG) Response to NRC Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request, Dated May 5, 2014 (← links)
- LR-N12-0075, Core Operating Limits Report, Reload 16, Cycle 17, Revision 6 (← links)
- LR-N11-0087, 2011 Annual Report - Guarantees of Payment of Deferred Premiums (← links)
- LR-N08-0029, Transmittal of Proprietary Report 07-17P, Revision 3, Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Model. (← links)
- LR-N08-0028, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N08-0014, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N07-0215, Supplement to License Amendment Request for Extended Power Uprate (← links)
- LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate (← links)
- LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N05-0247, Stations - Guaranteed Retrospective Premiums Following a Nuclear Accident (← links)
- LR-N19-0074, Core Operating Limits Report, Reload 21, Cycle 22, Revision 16 (← links)
- LR-N05-0448, Response to Request for Additional Information Re Request for Change to Technical Specifications Arts/Mellla Implementation (← links)
- LR-N19-0101, Submittal of Core Operating Limits Report, Reload 22, Cycle 23, Revision 17 (← links)
- ML041900426 (← links)
- LR-N03-0386, Transmittal of Information Relating to SVEA-96+ Modeling Dimensions in Support of the Nrc'S Review of GNF-A Proprietary Report, NEDC-33107P, GEXL80 Correlation for SVEA96+ Fuel, Dated September 2003 (← links)
- LR-N20-0023, License Amendment Request: Revise Hope Creek Generating Station Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (← links)
- LR-N21-0042, Core Operating Limits Report, Reload 23, Cycle 24, Revision 21 (← links)
- LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication (← links)
- LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication (← links)
- LR-N22-0083, Enclosure 3 - Global Nuclear Fuel - Americas Affidavit of Lukas Trosman (← links)