Pages that link to "L-HU-05-014, Comment (14) of Edward J. Weinkam Re Draft Generic Letter 2005-XX: Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power"
Jump to navigation
Jump to search
The following pages link to L-HU-05-014, Comment (14) of Edward J. Weinkam Re Draft Generic Letter 2005-XX: Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power:
Displayed 21 items.
- L-2018-090, Comment (7) of Larry Nicholson, on Behalf of Florida Power & Light Co., on Qualification and Training of Personnel for Nuclear Power Plants (← links)
- L-2016-163, Comment (5) of Larry Nicholson on Behalf of NextEra Energy Seabrook, LLC, on Dedication of Commercial-Grade Items for Use in Nuclear Power Plants (← links)
- L-2016-171, Comment (1) of Larry Nicholson, on Behalf of NextEra Energy and Florida Power and Light, on Consideration of Rulemaking to Address Prompt Remediation of Residual Radioactivity During Operations (← links)
- L-2016-086, Comment (6) of Larry Nicholson on Behalf of NextEra Energy, Inc., on Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure (← links)
- L-2014-221, Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131) (← links)
- L-2013-003, Comment (147) of Larry Nicholson on Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation (← links)
- L-2012-418, Comment (5) of Larry Nicholson on Behalf of NextEra Energy, on Request for Comment, NUREG-1307 (77 Fed. Reg. 58,591, Sept 21, 2012) (← links)
- L-2012-017, Comment (13) of Larry Nicholson, on Behalf of Florida Power & Light Co., and Nextera Energy, Supporting 2011 Reactor Oversight Process External Survey (← links)
- L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. (← links)
- L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. (← links)
- L-2010-238, Comment (10) of Larry Nicholson on Behalf of Florida Power & Light Co., on Revised Draft Safety Culture Policy Statement (← links)
- L-2010-142, Comment (23) of Larry Nicholson, on Behalf of NextEra Energy, on NRC Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment (← links)
- L-2010-101, Comment (1) of Larry Nicholson, on Behalf of Florida Power & Light Co., on Proposed NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Branch Technical Position (BTP) 7-19, Guidance for .. (← links)
- L-2009-230, Comment (18) of Mchenry Cornell, on Behalf of Florida Power & Light Company, on NRC Docket Id 2008-0122, Enhancements to Emergency Preparedness Regulations (← links)
- L-2009-230, Comment (8) of Mchenry Cornell on Behalf of Florida Power & Light Company, on NRC-2008-0122 Enhancements to Emergency Preparedness Regulations, Proposed Rule (← links)
- L-2009-231, Comment (06) of Mchenry Cornell on Behalf of Florida Power & Light Company on the Proposed Generic Communication, NRC Regulatory Issue Summary 2005-02, Revision 1, Clarifying the Process for Making Emergency Plan Changes (← links)
- L-2008-237, Comment (2) of Robert J. Hughes for Point Beach (← links)
- L-2007-147, Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. (← links)
- L-2006-261, Comment (13) of J. A. Stall on Behalf of Florida Power & Light Company, Regarding Nrc'S Reactor Oversight Process (← links)
- L-HU-05-014 (redirect page) (← links)
- ML051890020 (redirect page) (← links)