Pages that link to "L-2007-110, Topical Quality Assurance Report (Fpltqar 1-76A)"
Jump to navigation
Jump to search
The following pages link to L-2007-110, Topical Quality Assurance Report (Fpltqar 1-76A):
Displayed 50 items.
- ML15356A185 (← links)
- ML15314A580 (← links)
- ML15154B079 (← links)
- ML15154B077 (← links)
- L-2015-260, St. Lucie, Units 1 and 2 - EPU Biological Study Quality Assurance Plan, Final (← links)
- L-2015-160, WCAP-17939-NP, Revision 0, Analysis of Capsule 97 Degrees from the Florida Power & Light Company St. Lucie, Unit 2, Reactor Vessel Radiation Surveillance Program, Part 3 of 3 (← links)
- L-2015-160, WCAP-17939-NP, Revision 0, Analysis of Capsule 97 Degrees from the Florida Power & Light Company St. Lucie, Unit 2, Reactor Vessel Radiation Surveillance Program, Part 2 of 3 (← links)
- L-2015-160, WCAP-17939-NP, Revision 0, Analysis of Capsule 97 Degrees from the Florida Power & Light Company St. Lucie, Unit 2, Reactor Vessel Radiation Surveillance Program, Part 1 of 3 (← links)
- ML18127A526 (← links)
- L-2011-418, ANP-2903Q1(NP), Revision 0, St Lucie Nuclear Plant Unit 1 EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding. (← links)
- ML103560448 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 10; WCAP-17094-NP, Revision 2, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis (← links)
- ML103560186 (← links)
- L-2010-078, WCAP-17197-NP, Rev. 0, St. Lucie Unit 1 RCS Pressure & Temperature Limits & Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years. (← links)
- ML101160204 (← links)
- L-2010-078, ANP-2903(NP), Rev. 0, St. Lucie Nuclear Plant Unit 1 EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding. (← links)
- ML101160197 (← links)
- L-2007-110, St. Lucie, Units 1 and 2, and Turkey Point, Units 3 and 4, Topical Quality Assurance Report (Fpltqar 1-76A) (redirect page) (← links)
- L-2007-110 (redirect page) (← links)
- ML071920159 (redirect page) (← links)
- L-2015-053, WCAP-17973-NP, Revision 1, Turkey Point, Units 3 and 4, Pressurizer Heater Sleeve Flaw Evaluation to Support Half-Nozzle Repairs, Enclosure 1 (Non-Proprietary) (← links)
- L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. (← links)
- L-2010-259, Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years (← links)
- L-2010-299, License Amendment Request for Extended Power Uprate, Attachment 12; WCAP-17070-NP, Revision 0, Westinghouse Setpoint Methodology for Protection Systems (← links)
- L-2017-122, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual Submittal (← links)
- L-2008-150, Duane Arnold, and Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 2 (← links)
- L-2016-129, NextEra Energy Quality Assurance Topical Report (QATR FPL-1) Revision 19 Annual Submittal (← links)
- L-2015-184, Units 1 and 2, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 17 (← links)
- L-2013-208, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 13 (← links)
- L-2011-243, Submittal of Quality Assurance Topical Report (QATR FPL-1), Revision 9 (← links)
- L-2010-138, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 7 (← links)
- L-2006-246, Response to RAI Follow-Up Questions Regarding Fpl'S Common Quality Assurance Topical Report Request (← links)
- L-2006-164, Topical Quality Assurance Report (Fpltqar 1-76A) (← links)
- L-2006-067, Request for Approval of FPL Quality Assurance Topical Report (← links)
- L-2019-134, Units 1 and 2 - Quality Assurance Topical Report, Revision 22, Annual Submittal (← links)
- L-2014-201, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 14 (← links)
- L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 (← links)
- ML18227B579 (← links)
- ML052790692 (← links)
- L-2019-119, Quality Assurance Program Description for 10 CFR Part 52 Licenses FPL-2 Revision 5 (← links)
- L-2018-123, Quality Assurance Program Description for 10 CFR Part 52 Licenses FPL-2 Revision 4 (← links)
- L-2004-233, Westinghouse WCAP-15918-NP, Revision 2, Steam Generator Tube Repair for Combustion Engineering and Westinghouse Designed Plants with 3/4 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves. (← links)
- ML050470363 (← links)
- ML033070012 (← links)
- ML031610789 (← links)
- L-2003-101, WCAP-16038-NP, Revision 0, Structural Integrity Evaluation or Reactor Vessel Upper Head Penetrations to Support Continued Operation: St. Lucie Unit 2, Table of Contents Through Figure 6.24 (← links)
- L-2003-002, to Topical Report WCAP-15975-NP, NDE Inspection Strategy for the Tubesheet Region in St. Lucie Unit 2. (← links)
- ML030020548 (← links)
- ML022940497 (← links)
- ML022940133 (← links)