Pages that link to "DCL-21-082, Submittal of Nuclear Material Transaction Report for New Fuel. Without Enclosures"
Jump to navigation
Jump to search
The following pages link to DCL-21-082, Submittal of Nuclear Material Transaction Report for New Fuel. Without Enclosures:
Displayed 50 items.
- DCL-18-023, 2018 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant (← links)
- DCL-17-055, Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment-Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Actio (← links)
- DCL-17-038, Diablo Canyon, Units 1 an 2, Submittal of Revised Updated Safety Analysis Report, Revision 23 (← links)
- DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 (← links)
- DCL-15-095, Response to NRC Request for Additional Information Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report (← links)
- DCL-15-054, One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage (← links)
- DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 2 (← links)
- DCL-15-042, Supplemental Licensee Event Report 1-2014-004-01 for Diablo Canyon, Units 1 and 2 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power (← links)
- DCL-15-041, Supplemental LER 2-13-004-01 for Diablo Canyon, Unit 2 Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-3 (← links)
- DCL-15-009, Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement (← links)
- DCL-14-045, Response to NRC Request for Additional Information Regarding Bequest for Preemption Authority (← links)
- DCL-14-030, Diablo, Units 1 and 2 - Report of 10 CFR 50.59, Changes, Tests and Experiments, for the Period of January 1, 2012 Through December 31, 2013 (← links)
- DCL-14-028, Conclusions of a Third Party Review of Areva Calculations (← links)
- DCL-13-103, Response to NRC Request for Additional Information Regarding Implementation of Multi-Unit/Multi-Source Dose Assessment Capability (← links)
- DCL-13-065, LAR-13-03 - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (← links)
- DCL-13-061, CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 2 (← links)
- DCL-13-061, Diablo Canyon, Units 1 and 2 - Submittal of CS Innovations Documents and Revised Software Configuration Management Plan for the License Amendment Request for Digital Process Protection System Replacement (← links)
- DCL-13-028, Diablo Canyon, Units 1 and 2, Submittal of Revised System Verification and Validation Plan and Tricon Documents for the License Amendment Request for Digital Process Protection System Replacement (← links)
- DCL-13-034, Licensee Event Report 12-005-00 for Diablo Canyon Regarding Expected Submittal Date (← links)
- DCL-12-128, Diablo Canyon, Units 1 & 2, Transmittal of Evacuation Time Estimate Study for Plant Emergency Planning Zone Evacuation Time Estimate (← links)
- DCL-12-117, 2011 Annual Commitment Change Summary Report (← links)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T (← links)
- DCL-12-041, Diablo Canyon Units 1 and 2, 2011 Annual Radiological Environmental Operating Report (← links)
- DCL-12-031, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-072, License Amendment Request 11-06, Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation' Dated Octob (← links)
- DCL-08-549, Third Quarter 2008 Report on Discharge Monitoring at Diablo Canyon Power Plant (← links)
- DCL-10-030, Invensys Operations Management Submittal to Support License Amendment Request from PG&E for Replacement of the Eagle 21 Process Protection System at Diablo Canyon Power Plant (← links)
- DCL-11-118, LER 11-05-001 for Diablo Canyon Unit 1, Emergency Diesel Generator Actuations Upon Loss of 230 Kv Startup Due to Electrical Maintenance Testing Activities (← links)
- DCL-11-119, LER 11-04-001 for Diablo, Unit 1, Regarding Emergency Diesel Generator Actuated Upon 230 Kv Isolation Due to Maintenance Activities on Relay Panel (← links)
- DCL-11-104, Diablo Canyon Units 1 and 2, License Amendment Request 11-07 Process Protection System Replacement (← links)
- DCL-11-072, LAR-11-006 - Revision to Technical Specification 3.3.5. Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation (← links)
- DCL-11-082, Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 (← links)
- DCL-11-081, Diablo Canyon, Units 1 and 2 - Sixty-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- DCL-11-073, Diablo Canyon, Unit 2 - Core Operating Limits Report for Cycle 17 (← links)
- DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys (← links)
- DCL-11-050, Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report (← links)
- DCL-11-045, Diablo Canyon, Units 1 and 2 - Request for Exemption from Specific 10 CFR Part 73 Requirements (← links)
- DCL-11-047, Diablo Canyon, Units 1 and 2 - Request for Deferral of Issuance of Renewed Operating Licenses (← links)
- DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010 (← links)
- DCL-11-035, Supplement to Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal. and Containment Spray Systems. (← links)
- DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California (← links)
- DCL-10-172, Diablo Canyon, Units 1 and 2, Delay of Submittal - PG&E Shoreline Fault Zone Final Report (← links)
- DCL-10-143, Diablo Canyon, Unit 1, Core Operating Limits Report for Cycle 17 (← links)
- DCL-10-125, Notification Letter Designating Diablo Canyon Balance of Plant Systems within the Cyber Security Rule Scope (← links)
- DCL-10-059, Diablo Canyon, Units 1 and 2 Evaluation of Shear-Wave Velocity Diablo Canyon ISFSI (← links)
- DCL-10-066, License Amendment Request 10-03, Damping Values for the Seismic Design and Analysis of the Reactor Vessel Integrated Head Assembly (← links)
- DCL-10-038, Diablo Canyon, Units 1 and 2, Submittal of 2009 Annual Nonradiological Environmental Operating Report (← links)
- DCL-10-030, Diablo Canyon, Units 1 & 2, Review of Topical Report, Process Protection System Replacement Diversity & Defense-in-Depth Assessment (← links)
- DCL-10-028, Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-09-093, License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17 (← links)
- DCL-09-015, Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant - 2009 Annual Statement of Insurance (← links)