Pages that link to "BSEP 16-0098, Duke Energy- Transmit Information for NRC Model Development Per Licensee September 6, 2016 Request for License Amendment Regarding Core Flow Operating Range Expansion"
Jump to navigation
Jump to search
The following pages link to BSEP 16-0098, Duke Energy- Transmit Information for NRC Model Development Per Licensee September 6, 2016 Request for License Amendment Regarding Core Flow Operating Range Expansion:
Displayed 33 items.
- ML16320A177 (redirect page) (← links)
- ML15023A044 (← links)
- ML12348A015 (← links)
- ML12076A062 (← links)
- RA-11-008, Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums (← links)
- ML090970248 (← links)
- ML090970246 (← links)
- ML072950366 (← links)
- ML072840217 (← links)
- ML072180370 (← links)
- ML072070305 (← links)
- RA-18-0202, Transmittal for NRC Confirmatory Calculations (← links)
- RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (← links)
- RA-18-0241, Update to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion (← links)
- BSEP 16-0098 (redirect page) (← links)
- BSEP 16-0101, Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion (← links)
- BSEP 10-0133, Response to Additional Information Request Supporting License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859) (← links)
- RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request (← links)
- RA-19-0241, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request (← links)
- BSEP 08-0009, Additional Information in Support of Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Fuel (← links)
- RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- BSEP 05-0152, Re-Submittal of Calculation Supporting Revised Main Steam Isolation Valve Leakage Limit (← links)
- BSEP 05-0132, Submittal of Supporting Calculations Regarding Revised Main Steam Isolation Valve Leakage Limit (← links)
- RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (← links)
- RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR (← links)
- RA-21-0021, 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Acceptable Loss of Coolant Evaluation Model (← links)
- RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-21-0138, Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Pair/Replacement of Service Water (SW) System Buried Piping in Accordance with (← links)
- RA-21-0194, Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/ Replacement of Service Water (SW) System Buried Piping in Accordance. (← links)