Pages that link to "B13019, Forwards Update on Isap Topic Reviews Discussed in Util ,Description of New Topics Being Added to Isap, Updated Integrated Implementation Schedule & Summary Table of Isap ARM Scores & Installation man-rem for Each Project"
Jump to navigation
Jump to search
The following pages link to B13019, Forwards Update on Isap Topic Reviews Discussed in Util ,Description of New Topics Being Added to Isap, Updated Integrated Implementation Schedule & Summary Table of Isap ARM Scores & Installation man-rem for Each Project:
Displayed 7 items.
- NUREG-1185, Advises That Util 890302 Response to Generic Ltr 83-28,Items 4.5.2 & 4.5.3 Re Reactor Trip Sys reliability,on-line Testing & Testing Intervals,Acceptable Per NUREG-1185 (← links)
- ML20235T241 (redirect page) (← links)
- B13225, Reiterates Util Position on 10CFR50.44(c)(3)(ii) & Provides Addl Info & Clarification Re Combustible Gas Control Issue. Calculations of Combustible Gas Generation Updated Following LOCA to Address Plans for Conversion to Zircaloy Cladding (← links)
- B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl (← links)
- A07863, Forwards Addl Info Supporting NRC Review of Atws/Auxiliary Feedwater Sys in Compliance w/10CFR50.62(c) & Westinghouse Generic Package Described in WCAP-10858P-A,Rev 1,Section 2-3,per 890302 Request (← links)
- B13019 (redirect page) (← links)
- B14298, Updates Justification or Clarification Required to Address 10 Open Items from Integrated Plant Safety Assessment, NUREG-0826,dtd June 1983,in Support of Final Closeout of SEP Topic III-5.A (← links)