Pages that link to "B11893, Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info"
Jump to navigation
Jump to search
The following pages link to B11893, Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info:
Displayed 31 items.
- ML20135G169 (← links)
- ML20141F878 (← links)
- ML20138F287 (redirect page) (← links)
- ML20134N605 (← links)
- ML20133F264 (← links)
- ML20133E707 (← links)
- ML20129A151 (← links)
- ML20126M298 (← links)
- ML20154E988 (← links)
- ML20151M062 (← links)
- ML20150C715 (← links)
- ML20195G527 (← links)
- ML20205R880 (← links)
- ML20214N797 (← links)
- TAC:44864 (← links)
- TAC:57809 (← links)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 (← links)
- ML20211A495 (← links)
- B12267, Application for Amend to License DPR-65,changing Tech Specs to Establish Requirement for Two Operable Trains of Spent Fuel Pool Cooling Until Most Recently Discharged 1/3 Core Decayed for 504 H.Fee Paid (← links)
- A06958, Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager (← links)
- B11916, Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested (← links)
- B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from (← links)
- B11893 (redirect page) (← links)
- B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131 (← links)
- B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons (← links)
- B11712, Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity (← links)
- B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity (← links)
- B11733, Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable (← links)
- B11271, Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid (← links)
- B11598, Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 851226 (← links)
- B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement (← links)