Pages that link to "B11839, Advises of Intent to Conduct Type a Tests During Mar 1988, Jan 1991 & Mar 1995,per 10CFR50,App J,Section III.A.6(a). Recent Type a Test Exceeds Max Leakage Rate Specified in Tech Specs.Schedule Ensures Primary Containment Integrity"
Jump to navigation
Jump to search
The following pages link to B11839, Advises of Intent to Conduct Type a Tests During Mar 1988, Jan 1991 & Mar 1995,per 10CFR50,App J,Section III.A.6(a). Recent Type a Test Exceeds Max Leakage Rate Specified in Tech Specs.Schedule Ensures Primary Containment Integrity:
Displayed 16 items.
- ML20140D822 (← links)
- ML20138R792 (← links)
- ML20138R295 (redirect page) (← links)
- ML20195C781 (← links)
- ML20205H698 (← links)
- 05000336/LER-1984-005, Confirms That Rev to LER 84-005 Will Be Submitted within 2 Months,Clarifying Performance of Type A,B & C Testing During 1983 Refueling Outage as Discussed in 860604 Meeting (← links)
- ML20206H955 (← links)
- ML20212R398 (← links)
- B12299, Forwards CENPD-274, Summary Rept,Fire Protection Qualification Testing of Silicon Dioxide Mineral Insulated Cable (← links)
- A06107, Submits Addl Info Re 10CFR50,App J Integrated Leak Rate Testing Conducted During Fall 1986 Refueling Outage,Per NRC .Preventative Maint Program for Fisher Butterfly Containment Isolation Valves Initiated (← links)
- ML20210G783 (← links)
- ML20210G761 (← links)
- ML20210B004 (← links)
- B12374, Submits Addl Info Re 820301 & 0716 Requests for Exemption from 10CFR50,App R Requirements for Cable Vault.Alternate Fire Protection Configuration Provides Reasonable Assurance That One Safe Shutdown Div Will Be Free of Fire Damage (← links)
- B11113, Forwards Reactor Containment Bldg Integrated Leak Rate Test,850614-16, Third Test in First 10-yr Inservice Period (← links)
- B11839 (redirect page) (← links)