Pages that link to "3F0396-19, Application for Amend to License DPR-72,consisting of Change Request 203,Rev 2,allowing Restart from Current Refueling Outage"
Jump to navigation
Jump to search
The following pages link to 3F0396-19, Application for Amend to License DPR-72,consisting of Change Request 203,Rev 2,allowing Restart from Current Refueling Outage:
Displayed 6 items.
- ML20101F608 (← links)
- ML20101F600 (← links)
- ML20101F590 (← links)
- ML20101F583 (redirect page) (← links)
- 3F0498-02, Application for Amend to License DPR-72,clarifying Improved Tech Specs 5.7.2, Special Repts, to State That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) (← links)
- 3F0396-19 (redirect page) (← links)
- ML20101F608 (← links)
- 3F0498-02, Application for Amend to License DPR-72,clarifying Improved Tech Specs 5.7.2, Special Repts, to State That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) (← links)
- 3F0496-23, Provides Addl Info & Commitments on TS Change Request 203, Rev 2 Re Dispositioning Strategy for Dealing W/Iga in First Span of OTSGs (← links)
- 3F0496-18, Forwards Summary of Statistical Analysis Re non-leakage Under Steam Line Break Conditions Based on in-situ Pressure Testing Performed on Facility SG Tubes During Current Refuel Outage 10,related to TS Change Request 203 (← links)
- 3F0496-04, Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications (← links)
- 3F0396-19, Application for Amend to License DPR-72,consisting of Change Request 203,Rev 2,allowing Restart from Current Refueling Outage (← links)