Pages that link to "2CAN052301, Cycle 30 Core Operating Limits Report (COLR)"
Jump to navigation
Jump to search
The following pages link to 2CAN052301, Cycle 30 Core Operating Limits Report (COLR):
Displayed 30 items.
- 2CAN032001, Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times (← links)
- 0CAN022102, Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping (← links)
- 2CAN102102, Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 46 (← links)
- 2CAN052301 (redirect page) (← links)
- ML23123A335 (redirect page) (← links)
- 1CAN101904, AN1-2020-04 Draft Outlines (← links)
- 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) (← links)
- 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (← links)
- 0CAN062301, Status of Actions to Return to Compliance (← links)
- 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) (← links)
- 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report (← links)
- 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) (← links)
- 2CAN012401, U.S. Additional Protocol (← links)
- 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 (← links)
- 0CAN012401, Registration of Cask Use (← links)
- 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) (← links)
- 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes (← links)
- 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply (← links)
- 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels (← links)
- 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles (← links)
- 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 (← links)
- 1CAN052401, Cycle 32 Core Operating Limits Report (← links)
- 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C (← links)
- 0CAN042402, Annual Occupational Radiation Exposure Report for 2023 (← links)
- 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year (← links)
- 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor (← links)
- 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications (← links)
- 1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 (← links)
- 0CAN102401, Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzle (← links)
- 2CAN102401, Cycle 31 Core Operating Limits Report (COLR) (← links)