Pages that link to "10 CFR 60.73"
Jump to navigation
Jump to search
The following pages link to 10 CFR 60.73:
Displayed 28 items.
- 10 CFR 60 (← links)
- 05000219/LER-2014-005, Secondary Containment Declared Inoperable (← links)
- ML17157C140 (← links)
- ML11171A066 (← links)
- ML16321A447 (← links)
- ML062830533 (← links)
- ML061660373 (← links)
- ML061660370 (← links)
- ML061660368 (← links)
- ML061660365 (← links)
- ML041910310 (← links)
- ML20128C238 (← links)
- ML20212E724 (← links)
- ML22326A244 (← links)
- 05000293/LER-1997-026, :on 971206,automatic Scram Was Initiated.Caused by High Reactor Water Level During Power Ascension.Pilot Valve Clip Was Repositioned Inside Bailey Positioner & Valve Was Stroked Smoothly (← links)
- 05000443/LER-1997-005, :on 970314,misposition of Main Steam Line Radiation Monitors Was Discovered.Caused by Human & Misjudgement Errors.Design Change Was Implemented to Relocate MSLRMs Approx 24 Inches Upstream (← links)
- 05000336/LER-1997-002-01, :on 970108,damper 2-HV-210 Could Not Be Manually Operated within Ten Minutes as Required in Accident Analysis.Caused by Inadequate Evaluation of Mechanical Binding.Damper Was Placed in Fail Open Position (← links)
- 05000409/LER-1985-014, :on 850725,partial Reactor Scram Occurred,Hpcs Pumps & Emergency Diesel Generators Started & Containment Bldg Isolated.Caused by Ground in Gas Pressure Scram Circuit.Ground Located & Wire Repaired (← links)
- 05000352/LER-1990-029-01, :on 901128,personnel Received Main Control Room Annunciator Alarm Associated W/Toxic Gas Detection Sys. Caused by Failure of Toxic Gas Analyzer Memory.Vendor Contacted to Provide Addl Actions (← links)
- 05000289/LER-1990-003, :on 900227,turbine Bypass Valves Isolated During Plant Heatup Due to Main Steam Valve Closure.Caused by Personnel Error.Personnel Reviewed Event to Emphasize Need to Follow Administrative Requirements (← links)
- 05000368/LER-1989-019-02, :on 890927,identified That Closing Torque on Valves May Be Insufficient Against Postulated Worst Case Differential Pressure.Caused by Initial Plant Construction. Mod to Replace Gearing Made to Motor Operator (← links)
- 05000368/LER-1989-017-01, :on 891005,discovered That Number of Operable Logarithmic Power Level Instrumentation Channels Less than Required by Tech Specs.Caused by Personnel Error.Shift Supervisor & Senior Reactor Operator Counseled (← links)
- ML19324B314 (← links)
- 05000254/LER-2015-004, Regarding Automatic Depressurization System Trip Logic Failure (← links)
- 05000219/LER-2014-005, Regarding Secondary Containment Declared Inoperable (← links)
- 05000254/LER-2014-003, Regarding HPCI Interlock Doors Opened Simultaneously Cause Loss of Secondary Containment (← links)
- 05000219/LER-2013-001, Regarding Automatic Reactor Scram Due to an Invalid Intermediate Range Monitor (IRM) Scram Signal (← links)
- 05000219/LER-2012-002-01, Regarding Loss of Offsite Power During Hurricane Sandy (← links)