Pages that link to "05000366/LER-1979-137, Forwards LER 79-137/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000366/LER-1979-137, Forwards LER 79-137/03L-0:
Displayed 14 items.
- 05000321/LER-1979-007, Forwards LER 79-007/03L-0 (← links)
- 05000366/LER-1979-106, Forwards LER 79-106/03L-0 (← links)
- ML20125D488 (redirect page) (← links)
- 05000366/LER-1979-137 (redirect page) (← links)
- 05000366/LER-1979-131, Forwards LER 79-131/03L-0 (← links)
- 05000321/LER-1979-056, Forwards LER 79-056/01T-0 (← links)
- 05000366/LER-1979-137-03, /03L-0:on 791224,during HNP-2-1050 Surveillance Checks,Drywell & Torus Temp Recorder Found Printing Erratic Temps.Caused by Cold Solder Joint on Transistor Lead Making Pen Respond Erratically.Transister Pins Resoldered to Ca (← links)
- 05000366/LER-1979-131-03, /03L-0:on 791206,during Normal Operation,Torus Narrow Range Level Recorder Failed Upscale,Indicating High Water Level.Caused by Leaking Vent Plug on Manifold Block Valve.Leak Corrected.Plugs Will Be Checked Regularly (← links)
- 05000366/LER-1979-134-03, /03L-0:on 791214,during Fission Product Instrument Functional test,2D11-K633 Failed to Give Inoperative Response W/Mode Switch Taken Out of Operation.Caused by Bad Wiring Connection.Instrument Replaced & Tested (← links)
- 05000321/LER-1979-054-06, /06T-0 on 790802:during Monthly Inventory of Onsite Snm,Discovered Three Detectors Had Been Mistakenly Shipped Off Site for Disposal W/O Authorization.Caused by Improper Tagging.Procedure Changes Submitted (← links)
- 05000321/LER-1979-056-01, /01T-0 on 790803:during Performance of Hanger Rework Project,Discovered Section of Piping Crossfied Not Supported Per Seismic Class I Requirements.Caused by Design Error.Piping Upgraded (← links)
- 05000321/LER-1979-051-03, /03L-0 on 790726:during Cold Shutdown,While Performing Design Change Request 78-201,control Power Cables to E11-F008 Valve Were Disconnected & Cut W/Valve in Open Position.Caused by Personnel Error.Valve Reconnected (← links)
- 05000321/LER-1979-007-03, /03L-0 on 790120:reactor Core Isolation Cooling Min Flow Valve (E51-F019) Failed to Close Automatically. Caused by Failure of Open Limit Switch,Resulting in Damage to Valve Operator & Torque Switch (← links)
- 05000321/LER-1979-010-03, /03L-0 on 790124:during Normal pre-conditional Ramp,Determined That a Reactor Coolant Chemistry Sample Could Not Be Obtained.Caused by Both Reactor Water Cleanup Pumps Being Inoperable & Primary Sample Line Clogged (← links)