Pages that link to "05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121"
Jump to navigation
Jump to search
The following pages link to 05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121:
Displayed 21 items.
- 05000282/LER-1998-014, Forwards LER 98-014-01,re Fire Area 32 App R Safe Shutdown Analysis Issues.Detailed Safety Significance Evaluation for Event Included in Attachment 2.Event Reported Via ENS IAW 10CFR50.72 on 980827 (← links)
- 05000282/LER-1998-015, Forwards LER 98-015-01,re Containment to RHR MOVs App R Safe Shutdown Analysis Issues.Attachment 2 Contains Detailed Safety Significance Evaluation for NRC Info.Event Reported Via ENS IAW 10CFR50.72 on 980827 (← links)
- 05000282/LER-1998-011, Forwards LER 98-011-00 Re Improper Acceptance Criteria in Surveillance Procedure.Util Has Made One New NRC Commitment as Indicated in Corrective Action Section Statement in Bold Italics (← links)
- 05000282/LER-1998-013, Forwards LER 98-013-00 Re Discovery of Scaffold Installation Interfering with Operability of Steam Exclusion Check Damper.Util Has Made Two New Commitments as Indicated in Bold Italics in Corrective Actions Section (← links)
- 05000306/LER-1998-006, Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements (← links)
- 05000282/LER-1998-018, Forwards LER 98-018-00,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric Acid (← links)
- 05000282/LER-1998-017, Forwards LER 98-017-00,re Failure to Test SR Hi Flux Trip Functions During non-refuelings Outages.Commitments Made by Util Are Indicated in Corrective Actions Section of LER (← links)
- 05000282/LER-1998-012, Forwards LER 98-012-02,re Fire Areas 58/73 App R Safe Shutdown Analysis Issues.Rept Has Been Changed to Delete Inappropriate Characterization of Aspect of Event as Violation of 10CFR50,App R (← links)
- 05000282/LER-1998-010, Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER (← links)
- ML20203B382 (redirect page) (← links)
- 05000306/LER-1998-001 (redirect page) (← links)
- 05000306/LER-2015-002 (← links)
- 05000306/LER-2016-001 (← links)
- 05000306/LER-2017-003 (← links)
- 05000306/LER-2017-002 (← links)
- 05000306/LER-2017-001 (← links)
- 05000306/LER-1982-009, Forwards LER 82-009/03L-0 (← links)
- 05000306/LER-1982-027, Forwards LER 82-027/03L-0 (← links)
- 05000306/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000306/LER-1982-013, Forwards LER 82-013/03L-0 (← links)
- 05000306/LER-1982-010, Forwards LER 82-010/01T-0 (← links)
- 05000306/LER-1981-002, Suppl to LER 81-002/01T-0:on 810301, Error in Installing Plug on Degraded Tube in Steam Generator 22 Caused Plant Shutdown.Minor Leakage Observed Through Late Aug 1981.On 810903 Leakage Increased.Exam Results Listed (← links)
- 05000306/LER-1978-017, Forwards LER 78-017/03L-0 (← links)
- 05000306/LER-1978-019, Forwards LER 78-019/03L-0 (← links)
- 05000306/LER-1982-012, Forwards LER 82-012/03L-0 (← links)
- 05000306/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000306/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000306/LER-1995-003, Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe (← links)
- 05000306/LER-1995-002, Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error (← links)
- 05000306/LER-1978-024, Forwards LER 78-024/03L-0 (← links)
- 05000306/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000306/LER-1997-001, Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 970207 (← links)
- 05000306/LER-1998-006, Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements (← links)
- 05000306/LER-1997-005, Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 (← links)
- 05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 (← links)
- 05000306/LER-1997-004, Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed (← links)
- 05000306/LER-1998-003, Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics (← links)
- 05000306/LER-1998-002, Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl (← links)
- 05000282/LER-1998-003, Forwards LER 98-003-00 Re Routing of Containment Dome Fan Coil Unit Exhaust Damper Control Circuit Wiring Contrary to Configuration Described in Usar.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 9 (← links)
- 05000282/LER-1998-019, Forwards LER 98-019-00 Re Discovery That Containment Penetration Piping Segment Could Be Pressurized Beyond Design Basis.Util Made One New NRC Commitment,Indicated as Corrective Action Statement in Italics (← links)
- 05000282/LER-1998-009, Forwards LER 98-009-00 Re Rc Vent Sys Testing.New Commitments Made by Util Are Indicated in Corrective Actions Section Statement in Bold Italics (← links)
- 05000306/LER-1998-003, Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics (← links)
- 05000282/LER-1998-005, Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl (← links)
- 05000306/LER-1998-002, Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl (← links)
- 05000282/LER-1998-007, Forwards LER 98-007-01,re Diesel Generator Logic Testing. Commitment Made within Ltr Noted in Corrective Actions Section (← links)
- 05000282/LER-1998-001, Forwards LER 98-001-01 Re Leakage Through Redundant CR Steam Exclusion Dampers Found to Exceed Value Assumed in HELB Analysis.Licensee Has Modified Three NRC Commitments Made in Original Ler,As Noted by Corrective Actions in It (← links)
- 05000282/LER-1998-002, Forwards Proprietary Rept, Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2, in Response to RAI Dtd 980218. Suppl Rept for LER 98-02 Will Also Be Delayed.Rept W (← links)
- 05000282/LER-1998-004, Forwards LER 98-004-00,re ESF Equipment in Alternate Train Inoperable During DG Monthly Surveillance Run (← links)