|
---|
Category:Legal-Affidavit
MONTHYEAR2CAN102402, Enclosure 2: Framatome Affidavit2024-10-20020 October 2024 Enclosure 2: Framatome Affidavit 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) ML23020A9442023-01-20020 January 2023 Enclosure 3: Affidavit 2CAN122103, Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Submittal of Analyses - Affidavits and Calculation Summary Sheet2021-11-19019 November 2021 Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Submittal of Analyses - Affidavits and Calculation Summary Sheet 2CAN102102, Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 462021-10-10010 October 2021 Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 46 0CAN092101, Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-09-14014 September 2021 Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping 0CAN052103, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency .2021-05-25025 May 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency . 0CAN022101, Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-02-22022 February 2021 Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping 2CAN032001, Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times2020-03-11011 March 2020 Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times 1CAN121601, Arkansas Nuclear One Unit 1, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan2016-12-21021 December 2016 Arkansas Nuclear One Unit 1, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan 1CAN121601, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan2016-12-21021 December 2016 Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan 1CAN121502, Evaluations Described Response to Requests for Additional Information 3, 5, 6(a), and 7, Reactor Vessel Internals Aging Management Program Plan2015-12-30030 December 2015 Evaluations Described Response to Requests for Additional Information 3, 5, 6(a), and 7, Reactor Vessel Internals Aging Management Program Plan ML15278A0242015-09-28028 September 2015 Attachment 2, Areva Document ANP-3417NP, Revision 0, MRP-227-A Applicant / Licensee Action Item No. 7 Analysis for Arkansas Nuclear One, Unit 1 (Non-Proprietary), Attachment 3, Affidavit, and Attachment 4, List of Commitments 2CAN051504, Revised Affidavit for Request for Relief ANO2-ISI-0162015-05-19019 May 2015 Revised Affidavit for Request for Relief ANO2-ISI-016 1CAN031504, Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN031504, Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits ML15041A0742015-02-0606 February 2015 ANP-3300Q1NP, Rev. 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, Attachment 2 to 1CAN0 2CAN111402, Unit 2, Revised Affidavit for Request for Relief ANO2-ISI-0162014-11-11011 November 2014 Unit 2, Revised Affidavit for Request for Relief ANO2-ISI-016 2CAN041402, Successive Examination Plans, Request for Relief ANO2-ISI-016. Weld Scan Plans & Preliminary Coverage Estimates, Pdqs Number 783 & Affidavit Enclosed2014-04-15015 April 2014 Successive Examination Plans, Request for Relief ANO2-ISI-016. Weld Scan Plans & Preliminary Coverage Estimates, Pdqs Number 783 & Affidavit Enclosed 0CAN041401, NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings2014-04-0101 April 2014 NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings 0CAN071303, Units 1 and 2, Augmented Inspection Team Information Request2013-07-31031 July 2013 Units 1 and 2, Augmented Inspection Team Information Request ML12038A1772012-02-0303 February 2012 Units 1 and 2, HI-STORM 100 Cask System, Thermal Validation Test Using Air Mass Flow Rate ML0935005322009-12-11011 December 2009 Affidavit from Gayle F. Elliot, Manager of Product Licensing for Areva, Np Inc ML0828300342008-08-20020 August 2008 Affidavit of Gayle F. Elliott, for Areva Np Inc., Regarding NRC Presentation of August 2008 ML0627703182006-09-28028 September 2006 Transmittal of Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Proprietary/Non-Proprietary) ML0514603882005-05-10010 May 2005 Units 1 and 2, Request for Additional Information Concerning Request for Exemption from Holtec International Certificate of Compliance 2CAN010402, Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection2004-01-16016 January 2004 Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection ML15350A2151985-09-0505 September 1985 Overview Description of Core Operating Limit Supervisory System (Colss)(Rev 00-NP to CEN-312-NP) 2024-10-20
[Table view] |
Text
AFFIDAVIT STATE OF WASHINGTON ss.COUNTY OF BENTON 1. My name is Gayle F. Elliott. I am Manager, Product Licensing, for AREVA NP Inc. and as such I am authorized to execute this Affidavit.
- 2. I am familiar with the criteria applied by AREVA NP to determine whether certain AREVA NP information is proprietary.
I am familiar with the policies established by AREVA NP to ensure the proper application of these criteria.3. I am familiar with the AREVA NP information contained in the NRC Presentation, Arkansas Nuclear One -Unit One, Entergy/AREVA NP on the ANO Unit 1 Tie Rod Bowing and Wear Root Cause Review, dated August 2008 and referred to herein as"Document." Information contained in this Document has been classified by AREVA NP as proprietary in accordance with the policies established by AREVA NP for the control and protection of proprietary and confidential information.
- 4. This Document contains information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA NP and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in this Document as proprietary and confidential.
- 5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document be withheld from public disclosure.
The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financial information." 6. The following criteria are customarily applied by AREVA NP to determine whether information should be classified as proprietary: (a) The information reveals details of AREVA NP's research and development plans and programs or their results.(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.(e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP.The information in the Document is considered proprietary for the reasons set forth in paragraphs 6(b) and 6(c) above.7. In accordance with AREVA NP's policies governing the protection and control of information, proprietary information contained in this Document has been made available, on a limited basis, to others outside AREVA NP only as required and under suitable agreement providing for nondisclosure and limited use of the information.
- 8. AREVA NP policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis.
- 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief.SUBSCRIBED before me t day of August, 2008.his 0 zlvý Ce Susan K. McCoy NOTARY PUBLIC, STATE OF WASHINGTON MY COMMISSION EXPIRES: 1/10/12