ML102440635
| ML102440635 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/01/2010 |
| From: | Reyes L A Region 2 Administrator |
| To: | Madison D R Southern Nuclear Operating Co |
| Shared Package | |
| ML102440631 | List: |
| References | |
| Download: ML102440635 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 09/01/2010 13:28:14 Report 22 09/01/2010
-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch ISFSI-ISFSI ROUTINE LOADING OF 2 CASKS 1 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/15/2010 09/30/2010 OL RQ-REQUAL INSPECTION 6 1, 2 IP Licensed Operator Requalification Program 7111111B 09/13/2010 09/17/2010 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 10/18/2010 10/22/2010 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 10/18/2010 10/22/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/18/2010 10/22/2010 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/18/2010 10/22/2010 1, 2 IP Performance Indicator Verification 71151 10/18/2010 10/22/2010 TFPI-TFPI 7 1, 2 IP Fire Protection [Triennial]
7111105T 11/15/2010 11/19/2010 1, 2 IP Fire Protection [Triennial]
7111105T 11/29/2010 12/03/2010 PSB1-TI-TI-179 NSTS VERIFICATION 3 1, 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 03/28/2011 04/01/2011 1, 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 04/11/2011 04/15/2011 PSB1-RP-RP OCCUPATIONAL WEEK 1 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/28/2011 04/01/2011 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/28/2011 04/01/2011 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/28/2011 04/01/2011 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 03/28/2011 04/01/2011 1, 2 IP Performance Indicator Verification 71151 03/28/2011 04/01/2011 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR 7111108G 04/04/2011 04/08/2011 PSB1-RP-RP-OCCUPATIONAL WEEK 2 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/11/2011 04/15/2011 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2011 04/15/2011 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/11/2011 04/15/2011 1, 2 IP Performance Indicator Verification 71151 04/11/2011 04/15/2011 OL EXAM-INITIAL EXAM PREP 4 1 HATCH/JUNE 2011 EXAM AT POWER FACILITIES V23345 05/16/2011 05/20/2011 OL EXAM-INITIAL EXAM - WEEK 1 4 1 HATCH/JUNE 2011 EXAM AT POWER FACILITIES V23345 06/06/2011 06/10/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 09/01/2010 13:28:14 Report 22 09/01/2010
-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch OL EXAM-INITIAL EXAM - WEEK 2 4 1 HATCH/JUNE 2011 EXAM AT POWER FACILITIES V23345 06/13/2011 06/17/2011 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Identification and Resolution of Problems 71152B 09/12/2011 09/16/2011 1, 2 IP Identification and Resolution of Problems 71152B 09/26/2011 09/30/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP Exercise Evaluation 7111401 10/31/2011 11/04/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/31/2011 11/04/2011 1, 2 IP Performance Indicator Verification 71151 10/31/2011 11/04/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.