ML111420005

From kanterella
Revision as of 03:12, 8 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Waterford Unit 3 - Notification of NRC Initial Retake Operator Licensing Examination 05000382-11-302
ML111420005
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/18/2011
From: Haire M S
Operations Branch IV
To: Kowalewski J A
Entergy Operations
References
50-382/11-302
Download: ML111420005 (3)


See also: IR 05000382/2011302

Text

May 18, 2011

Joseph A. Kowalewski, Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3

17265 River Road Killona, LA 70057-0751

SUBJECT: Waterford Unit 3 - NOTIFICATION OF NRC INITIAL RETAKE OPERATOR LICENSING EXAMINATION 05000382/2011302

Dear Mr. Kowalewski:

In a telephone conversation on May 10, 2011, between Messrs. John Signorelli and Kelly Clayton, Chief Examiner, arrangements were made for the administration of a retake initial licensing examination at Waterford 3 during the week of August 8, 2011.

As agreed during the telephone conversation, your staff will prepare the operating test (walk-through portion only) based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might

be necessary before the examination is administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by June 17, 2011. The walk-through portion of the operating test and supporting reference materials identified in Attachment 3 to ES-201 will be due by July 6, 2011. Pursuant

to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline and test before it is submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examination is required on August 10 and August 11, 2011.

In order to conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation

facility available on the dates noted above.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125

Joseph A. Kowalewski -2-

To permit timely NRC review and evaluation, your staff should submit the preliminary operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024) and waiver requests (if any)

(OMB approval number 3150-0090) at least 30 days before the first examination date. If the application is not received at least 30 days before the operating test date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the first operating test date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Signorelli has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Clayton at 817-860-8216, or myself at 817-860-8159.

Sincerely,

/RA/

Mark S. Haire, Chief Operations Branch Division of Reactor Safety

Docket: 50-382 License: NPF-38

Distribution via ListServe for Waterford

Joseph A. Kowalewski -3-

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) Branch Chief, DRS/OB (Mark.Haire@nrc.gov) Senior Resident Inspector (Marlone.Davis@nrc.gov) Resident Inspector (Dean.Overland@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) Project Engineer (Jim.Melfi@nrc.gov) Project Engineer (William.Schaup@nrc.gov) WAT Administrative Assistant (Linda.Dufrene@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov

R:\ ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: MSH

Publicly Available Non-Sensitive

Non-publicly Available Sensitive SOE: OB C: OB K Clayton M Haire /RA/ /RA/ 5/18/11 5/18/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax