| Q | CCA | Title |
---|
05000346/FIN-2015407-01 | 2015Q3 | | Security |
05000346/FIN-2015003-01 | 2015Q3 | | Flow Accelerated Corrosion Model Not Maintained In Accordance with Industry Standards and Guidance |
05000346/FIN-2015408-01 | 2015Q4 | P.2 | Security |
05000346/FIN-2015004-01 | 2015Q4 | | Failure to Use Worst Case 4160 Vac Bus Voltage In Design Calculations |
05000346/FIN-2016001-01 | 2016Q1 | H.6 | Operation of Safety Related Butterfly Valves in a Manner Beyond Design |
05000346/FIN-2016001-04 | 2016Q1 | H.7 | Less than Sufficient Work Package Documentation and Instructions Resulted in an Inadequate Part Being Installed into the Plants Integrated Control System |
05000346/FIN-2016001-06 | 2016Q1 | H.1 | Less than Adequate Procedural Instructions for Restoring Main Feedwater Following a Reactor Trip |
05000346/FIN-2016001-05 | 2016Q1 | P.2 | Lack of Software Change Controls and Inadequate Corrective Action for an Operator Workaround Contributes to Complications Experienced During a Reactor Trip |
05000346/FIN-2016001-02 | 2016Q1 | | Service Water Header Operability While Using a Degraded No. 3 CCW HX SW Outlet Isolation Valve (SW37) for SW Header Pressure Control |
05000346/FIN-2016001-03 | 2016Q1 | | Shield Building Emergency Ventilation System Operability with Watertight Door No. 108 Inadvertently Left Open |
05000346/FIN-2016404-01 | 2016Q2 | H.4 | Security |
05000346/FIN-2016002-04 | 2016Q2 | H.2 | Inadequate Post-Manufacture Quality Control Inspections Performed for ASME Section III, Class 2 Reactor Coolant Pump Seal Cavity Vent Line Flexible Hose |
05000346/FIN-2016002-02 | 2016Q2 | P.1 | Failure to Use the Corrective Action Program to Evaluate and Document Degraded Condition with Auxiliary Feedwater Train 2 |
05000346/FIN-2016002-03 | 2016Q2 | P.3 | Inadequate Evaluation of Trend Related to A25X Fuse Failures |
05000346/FIN-2016002-01 | 2016Q2 | | Mispositioned Instrument Air Valves Result in Plant Transient |