ML12005A058
| ML12005A058 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 09/09/2011 |
| From: | Walker S A NRC/RGN-II |
| To: | Clagg R L, Franke M E, Suggs L M NRC/RGN-II |
| References | |
| FOIA/PA-2011-0357 | |
| Download: ML12005A058 (1) | |
Text
From: Walker. Shakur To: Kolcur. Greaory Cc: Franke, Mark; Suggs. LaDonna; Claga. Rodney
Subject:
NA AIT Requests -Walker 9/9/11 Date: Friday, September 09, 2011 1:22:14 PM Please provide the following requests to the licensee: 1. Regarding 2H EDG, please provide manufacturing specs for the jacket water cooling gasket 2. Regarding 1J/2J EDG Missing Orifice Plates: a. How long has the condition existed for both diesels?b. Why was the pump replaced previously?
- c. Why was the pump being replaced/worked on 9/4/11 which led to the discovery?
- d. Please explain what is meant by the missing plate was found still attached to the removed discharge flange (i.e., for which pump -current or from 2004)e. Please be prepared to discuss CR 441537/441540 I'm reviewing the other OD now and if I have additional questions, I'll provide them.Thanks Shakur Shakur A. Walker I Sr. Reactor Inspector Engineering Branch 1 I Electrical
/ Digital I&C U S Nuclear Regulatory Commission p_404.997.4639 I L404.997.4907 shakur.walker@
nrc.gov