NL-16-034, Watts Bar, Unit 2 - TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program

From kanterella
Revision as of 22:45, 12 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Watts Bar, Unit 2 - TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program
ML16050A527
Person / Time
Site:  Tennessee Valley Authority icon.png
Issue date: 02/19/2016
From: Shea J W
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-16-034
Download: ML16050A527 (3)


Text

sf-"-rrity sensitive lnformation - withhold under {0 GFR 2.390 This page is decontrolled when separated from Enclosure 2 Tennessee Ualley Authority, eo cNL-16-034 February 19, 201O 10 cFR s0.4(bx6)10 cFR 50.34(b)10 cFR 2.390 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Wattrs Bar Nuclear plant Unit 2 Facility Operating Lioense No. NpF_96 NRC Docket No. S0-39,t Subject TMI Task Acfion 1.D.1 Commitment Closure Regarding Control Room Deslgn Review Special program

References:

1. wA Letterto NRC, dated July 27,19E3 (Mloz3s30a7s)
2. NUREG-0841 fupplement 15'safety Evaluation Report - Retated to the Operation of Watts Bar Nuclear Plani, Units land 2," dated June lgg5 ln Reference 1, the T.enn99ge-e Valley Authority (TVA) committed to provide the Nuclear Regulatory Commission (NRC) with the following information forthe Watts Bar Nuclear plants wBN) related to the closure of the Action l.o.t in NUREG-0660, "NRc Action plan Developed as a Result of the TMI-2 Accident,'

regarding the controlroom design review (CnOn) progiam: ' TVA will submit the results of the additional noise measurements 120 days afier fuel loading. As noted in Table 18.1 of Reference 2, 'The NRC wifl review th6 results of the sound/noise survey, discussed below, which wil! be completed by TVA 120 days after fuel load, in relation to NUREG{700 Guideline 6.1.5.5, AuOitory Environmenti.', o TVA will take a complete set of color photographs of all panels located in the main control rooms and auxiliary control rooms after the respective units are operational for submittal to NRC 120 days afrerfuelloading.

Security Sensitive Information - Withhold Under 10 CFR 2.990 This page is decontrolled when separated from Enclosure z

security sensiflve lnformation - withhold Under i0 cFR 2.390 This page is decontroled when ="pi.l"Jftom Encro"* 2.U.S. Nuclear Regulatory Commission cNL-16-034 Page2 February 19,2016 Enclosure 1 provides the results of the WBN Unit 2 maincontrol room noise surv*y that was performed in accordance with NUREG-0700 Guideline 6.1.S.5, 'Auditory Environnient,, requirements.

Enclosure 1, Table 3, "Hazard Assessment Results/Sumharies," lists the five\A/BN Unit 2 main control room locations and the conesponding noise measurement at each location.

Page E16 depicts the five main control room iocatiois where u." noi"" reasurements were taken. Main contro! room positions 1 and 2 are located behind the horseshoe where normal communications are not performed.

Normalcontrolroom communications are performed in positions 3,4, and, 5 and are no more than 7 feet apart. Per NUREG{700, these bilckground noise levels are within the r:ange where verbal communication should be intelligible using riormal to raised voice levels.Enclosure 2 provides a compact disk (CD) containing the color photographs of the main control room and auxiliary control room panels. The informition provid'ed in En6bsure 2 contains security sensitive information in accordance with 1O CFR 73.21(a)(11(i).

Because of the sensitive nature of this submittal, TVA request that this information be witfrne6 from public disclosure in accordance with 10 CFR 2.390.There are no new regulatory commitments in this letter. lf you have any questions, please contact Gordon Arent, Director of watts Bar site Licensing, at (429) 365-2004.Respectfully, J. W. Shea.Vice President, Nuclear Licensing

Enclosures:

1- wafts Bar Nuclear Plant, unit 2 Main control Room Noise survey 2. Watts Bar Nuclear Plant, Unit 2 Main Control Room and Auxiliary Control Room panel Photographs cc (Mo Enclosures):

NRC Regional Administrator - Region lt NRC Senior Resident lnspector, Unit 1 NRC Senior Resident lnspector, Unit 2 Security Sensitive lnformation - Withhold Under { 0 CFR 2.490 This page is decontrolled when separated from Enctosure z

security sensitive lnformation -wrthhold Under l0 cFR 2.390 This page is decontrolled when separated from Enclosure 2 ENCLOSURE 1 Tennessee Valley Authority Ituatts Bar Nuclear Plant, unit 2 Main control Room Noise survey CNL-16-034 E1-'t of 6 security sensitive lnformafion - withhold under 10 cFR 2.390 This page is decontrolled when separated from Enclosure 2

sf-"-rrity sensitive lnformation - withhold under {0 GFR 2.390 This page is decontrolled when separated from Enclosure 2 Tennessee Ualley Authority, eo cNL-16-034 February 19, 201O 10 cFR s0.4(bx6)10 cFR 50.34(b)10 cFR 2.390 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Wattrs Bar Nuclear plant Unit 2 Facility Operating Lioense No. NpF_96 NRC Docket No. S0-39,t Subject TMI Task Acfion 1.D.1 Commitment Closure Regarding Control Room Deslgn Review Special program

References:

1. wA Letterto NRC, dated July 27,19E3 (Mloz3s30a7s)
2. NUREG-0841 fupplement 15'safety Evaluation Report - Retated to the Operation of Watts Bar Nuclear Plani, Units land 2," dated June lgg5 ln Reference 1, the T.enn99ge-e Valley Authority (TVA) committed to provide the Nuclear Regulatory Commission (NRC) with the following information forthe Watts Bar Nuclear plants wBN) related to the closure of the Action l.o.t in NUREG-0660, "NRc Action plan Developed as a Result of the TMI-2 Accident,'

regarding the controlroom design review (CnOn) progiam: ' TVA will submit the results of the additional noise measurements 120 days afier fuel loading. As noted in Table 18.1 of Reference 2, 'The NRC wifl review th6 results of the sound/noise survey, discussed below, which wil! be completed by TVA 120 days after fuel load, in relation to NUREG{700 Guideline 6.1.5.5, AuOitory Environmenti.', o TVA will take a complete set of color photographs of all panels located in the main control rooms and auxiliary control rooms after the respective units are operational for submittal to NRC 120 days afrerfuelloading.

Security Sensitive Information - Withhold Under 10 CFR 2.990 This page is decontrolled when separated from Enclosure z

security sensiflve lnformation - withhold Under i0 cFR 2.390 This page is decontroled when ="pi.l"Jftom Encro"* 2.U.S. Nuclear Regulatory Commission cNL-16-034 Page2 February 19,2016 Enclosure 1 provides the results of the WBN Unit 2 maincontrol room noise surv*y that was performed in accordance with NUREG-0700 Guideline 6.1.S.5, 'Auditory Environnient,, requirements.

Enclosure 1, Table 3, "Hazard Assessment Results/Sumharies," lists the five\A/BN Unit 2 main control room locations and the conesponding noise measurement at each location.

Page E16 depicts the five main control room iocatiois where u." noi"" reasurements were taken. Main contro! room positions 1 and 2 are located behind the horseshoe where normal communications are not performed.

Normalcontrolroom communications are performed in positions 3,4, and, 5 and are no more than 7 feet apart. Per NUREG{700, these bilckground noise levels are within the r:ange where verbal communication should be intelligible using riormal to raised voice levels.Enclosure 2 provides a compact disk (CD) containing the color photographs of the main control room and auxiliary control room panels. The informition provid'ed in En6bsure 2 contains security sensitive information in accordance with 1O CFR 73.21(a)(11(i).

Because of the sensitive nature of this submittal, TVA request that this information be witfrne6 from public disclosure in accordance with 10 CFR 2.390.There are no new regulatory commitments in this letter. lf you have any questions, please contact Gordon Arent, Director of watts Bar site Licensing, at (429) 365-2004.Respectfully, J. W. Shea.Vice President, Nuclear Licensing

Enclosures:

1- wafts Bar Nuclear Plant, unit 2 Main control Room Noise survey 2. Watts Bar Nuclear Plant, Unit 2 Main Control Room and Auxiliary Control Room panel Photographs cc (Mo Enclosures):

NRC Regional Administrator - Region lt NRC Senior Resident lnspector, Unit 1 NRC Senior Resident lnspector, Unit 2 Security Sensitive lnformation - Withhold Under { 0 CFR 2.490 This page is decontrolled when separated from Enctosure z

security sensitive lnformation -wrthhold Under l0 cFR 2.390 This page is decontrolled when separated from Enclosure 2 ENCLOSURE 1 Tennessee Valley Authority Ituatts Bar Nuclear Plant, unit 2 Main control Room Noise survey CNL-16-034 E1-'t of 6 security sensitive lnformafion - withhold under 10 cFR 2.390 This page is decontrolled when separated from Enclosure 2