ENS 48673
From kanterella
Revision as of 17:23, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
ENS Event | |
---|---|
00:05 Jan 15, 2013 | |
Title | Automatic Reactor Scram From 100% Power Due To A Turbine/Generator Trip |
Event Description | Actuation of RPS [Reactor Protection System] with reactor critical. The Reactor Scram occurred at 1805 [CST] 01/14/13 from 100% CTP [Core Thermal Power]. The cause of scram appears to be a Turbine Generator Trip.
05-S-01-EP-2 RPV Control, Reactor Scram ONEP [Off Normal Event Procedure] 05-1-02-I-1, and Turbine and Generator Trips ONEP 05-1-02-1-2 were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached and no ECCS or Diesel Generator initiation occurred. All control rods are fully inserted. MSIVs remained open and SRVs lifted and reseated as designed. Currently, reactor water level is being maintained by the Condensate and Feedwater system in the normal band and reactor pressure is being controlled via Main Turbine Bypass valves to the main condenser. There are no challenges to Primary or Secondary Containment at this time. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Grand Gulf Mississippi (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.02 h-0.0842 days <br />-0.012 weeks <br />-0.00277 months <br />) | |
Opened: | Hardy Farris 22:04 Jan 14, 2013 |
NRC Officer: | Vince Klco |
Last Updated: | Jan 14, 2013 |
48673 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48673\u003C/a\u003E - \u003Ca href=\"/Grand_Gulf\" title=\"Grand Gulf\"\u003EGrand Gulf\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Scram from 100% Power Due to a Turbine/Generator Trip\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48673 - Grand Gulf\n","link":"","lat":32.009233333333334,"lon":-91.04695833333334,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 574182024-11-10T09:37:00010 November 2024 09:37:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram ENS 568942023-12-16T09:50:00016 December 2023 09:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram Due to Turbine Trip ENS 562822022-12-20T03:01:00020 December 2022 03:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to Loss of Feedwater Pump ENS 559732022-06-30T19:45:00030 June 2022 19:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to Loss of Transformer ENS 550302020-12-11T18:04:00011 December 2020 18:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Main Turbine / Generator Trip ENS 549862020-11-06T08:39:0006 November 2020 08:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Turbine/Generator Trip ENS 548552020-08-25T04:05:00025 August 2020 04:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram After Loss of Feedwater - Grand Gulf ENS 548242020-08-08T06:27:0008 August 2020 06:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram Due to a Turbine High Pressure Control Valve Malfunction ENS 547252020-05-25T09:33:00025 May 2020 09:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Main Turbine Trip ENS 540622019-05-12T15:39:00012 May 2019 15:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Reactor Scram Due to Partial Loss of Service Water ENS 538942019-02-23T20:58:00023 February 2019 20:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram After Turbine Control Valve Fast Closure ENS 537882018-12-12T06:00:00012 December 2018 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge En Revision Imported Date 12/17/2018 ENS 536082018-09-14T05:00:00014 September 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram ENS 531882018-01-31T00:22:00031 January 2018 00:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Main Turbine Load Oscillations ENS 530902017-11-25T08:38:00025 November 2017 08:38:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram During Startup ENS 526632017-04-04T05:10:0004 April 2017 05:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Condensate Leak ENS 520442016-06-25T19:07:00025 June 2016 19:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Turbine Trip ENS 520122016-06-17T07:57:00017 June 2016 07:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram During Testing ENS 518272016-03-29T16:23:00029 March 2016 16:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Turbine Trip ENS 507952015-02-08T00:56:0008 February 2015 00:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 499722014-03-29T15:08:00029 March 2014 15:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to a Turbine Trip ENS 499202014-03-17T10:14:00017 March 2014 10:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Steam Leak in Low Pressure Turbine Line ENS 492252013-07-30T19:32:00030 July 2013 19:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Turbine Generator Trip ENS 486732013-01-15T00:05:00015 January 2013 00:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram from 100% Power Due to a Turbine/Generator Trip ENS 486522013-01-05T05:37:0005 January 2013 05:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to a Turbine/Generator Trip ENS 486372012-12-29T06:18:00029 December 2012 06:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to a Turbine/Generator Trip ENS 476792012-02-20T01:04:00020 February 2012 01:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram During Shutdown Due to Lowering Reactor Vessel Water Level (Rvwl) ENS 457532010-03-08T22:35:0008 March 2010 22:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Low Reactor Water Level ENS 446012008-10-26T16:25:00026 October 2008 16:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram and Isolation Due to Turbine Trip ENS 445952008-10-23T12:20:00023 October 2008 12:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram with Manual Rcic Initiation ENS 440862008-03-21T20:25:00021 March 2008 20:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram from a Main Turbine Trip ENS 438992008-01-12T22:26:00012 January 2008 22:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Degraded Cooling to Main Transformers ENS 435842007-08-21T19:15:00021 August 2007 19:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scrammed Due to Reactor Water Level 3 Rps Actuation ENS 433762007-05-19T16:27:00019 May 2007 16:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Turbine Trip on Loss of Condenser Vacuum ENS 414052005-02-12T01:59:00012 February 2005 01:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Rps Actuation 2024-11-10T09:37:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48673&oldid=85880"