ML15231A839

From kanterella
Revision as of 23:33, 8 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Sroi Systems Outline
ML15231A839
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D W
Shared Package
ML15217A099 List:
References
Download: ML15231A839 (1)


Text

NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:

__6/15/15 thru 6/26/15

__ Exam Level: RO SRO(I) SRO(U) Operating Test No.:

__DB NRC 2015__ Control Room Systems

@ (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U) System / JPM Title Type Code*

Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)

(JPM New) N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open

) (JPM New) N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path

- Trip Reactor)

(JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak

) (JPM New)

N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017) D, S 6 S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start

) (JPM 162)

D, A, S, L 8 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) P1 - (004) / Perform Att

. 5 of Control Room Evacuation

DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R 2 P2 - (0 64) / Restore EDG to supply 4160 Essential Bus

DB-OP-02538, Loss of D2P and DBP (JPM 079) D, E 6 P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528 , IA Malfunctions (JPM 078) D, E 8 @ All RO and SRO control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO

/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system)

(randomly selected)