Title | Part 21 - Miller Air Cylinder Seals Dedication Issue |
Event Description | The following was received from the licensee via fax:
This is to notify the US Nuclear Regulatory Commission that, in accordance with the provisions of 10 CFR Part 21, we have identified a potential issue and are submitting our evaluation of the event. Description: Flowserve supplied a quantity of two Size 6 Class 900 Anchor Darling Double Disc gate valves with tag numbers CV-3027 and CV-3056 to Palisades Nuclear Plant in 2007. The valves are actuated by Miller air cylinders and have a safety function to maintain the system pressure boundary by remaining fully open during injection and to subsequently move to the fully closed position upon receipt of a recirculation actuation signal. This Miller air cylinder is not spring-assisted and thus uses air to perform the safety-related function. As such, the air cylinder, any tubing, and seals associated with the air system would also be considered safety related. When the valve was tested prior to shipment, the actuator was dedicated as an assembly and performed adequately. However, the seals containing the air system in the Miller Air Cylinder and Flow Control valve were not individually dedicated as a basic component - that is, the seal material was not verified. There is no indication that the material is defective, but in addition to the functional testing at the Flowserve facility, the material of the seals should have been checked and verified. The Flow Control Valve was ordered with Nitrile (Buna-N) seals while the Air Cylinder was ordered with Viton seals. While the seal materials were not verified, the only possible seal material for these items would have been Viton, Buna-N, or EPR. Scope: Flowserve has performed a review of all other air cylinders provided from the Raleigh facility over the last 12 years and found no other instances of this issue. Therefore, the scope of this notification is limited to only the two tag numbers 01-3027 and CV-3056 at Palisades Nuclear Plant. Proposed Action: Flowserve will provide safety-related replacement seal kits for all seals containing the air system for the CV-3027 and CV-3056 valves. This will be sent on a zero dollar purchase order to Palisades Nuclear plant and will be completed as soon as Flowserve receives the purchase order. |
Where | |
---|---|
Flowserve Raleigh, North Carolina (NRC Region 1) | |
Organization: | Flowserve |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+9.75 h0.406 days <br />0.058 weeks <br />0.0134 months <br />) | |
Opened: | Randall Slomski 14:45 Nov 13, 2014 |
NRC Officer: | Daniel Mills |
Last Updated: | Nov 13, 2014 |
50610 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
Flowserve with 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
WEEKMONTHYEARENS 567642023-09-29T04:00:00029 September 2023 04:00:00
[Table view]10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Interim Report - Deviation Associated with an SMB-1 Geared Limit Switch Assembly ENS 562522022-10-05T05:00:0005 October 2022 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Deviation to Qualified Design ENS 550952020-12-09T05:00:0009 December 2020 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Report - Actuator Failure Due to Loose Cam Pins ENS 545842020-03-12T04:00:00012 March 2020 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component ENS 506102014-11-13T05:00:00013 November 2014 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Miller Air Cylinder Seals Dedication Issue 2023-09-29T04:00:00 | |