ENS 50560
ENS Event | |
---|---|
06:07 Oct 23, 2014 | |
Title | Secondary Containment Inoperable Due To Both Airlock Doors Open Simultaneously |
Event Description | At 0107 CDT on October 23rd, 2014, both doors in one of the Secondary Containment airlocks were momentarily open concurrently. This occurred during vessel drain down following refueling activities, an Operation with the Potential to Drain the Reactor Vessel (OPDRV), which required Secondary Containment to be operable. The doors being open at the same time resulted in the momentary inoperability of Secondary Containment. One of the doors was immediately closed, and Secondary Containment was restored to an operable status.
The station [Duane Arnold] has now completed the OPDRV associated with vessel drain down, and Secondary Containment is no longer required to be operable. The Resident Inspector has been notified.
The purpose of this notification is to retract a previous report made on 10/23/2014, at 0948 [EDT] (EN 50560). Notification of the event to the NRC was initially made as a result of an event where both doors in one of the Secondary Containment airlocks were momentarily open concurrently. This occurred during vessel drain down following refueling activities, an Operation with the Potential to Drain the Reactor Vessel (OPDRV), which required Secondary Containment to be operable. The doors being open at the same time resulted in the momentary inoperability of Secondary Containment. One of the doors was immediately closed, and Secondary Containment was restored to an operable status. Subsequent to the initial report, NextEra Energy Duane Arnold (NextEra) has determined that the doors in question were not mechanically degraded such that they were incapable of being closed. A momentary condition of having both secondary containment airlock doors open for a matter of seconds is not an event or condition that could have prevented the fulfillment of a safety. Furthermore, the conduct of OPDRVs during a momentary opening of both secondary containment doors that is immediately rectified does not constitute a condition prohibited by TS. Therefore, this event is not considered a Safety System Functional Failure or a Condition Prohibited by TS and is not reportable to the NRC as a Licensee Event Report (LER) per 10 CFR 50.73. The NRC Senior Resident Inspector has been notified. Notified the R3DO (McCraw). . |
Where | |
---|---|
Duane Arnold Iowa (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
Time - Person (Reporting Time:+3.68 h0.153 days <br />0.0219 weeks <br />0.00504 months <br />) | |
Opened: | Stephen Speirs 09:48 Oct 23, 2014 |
NRC Officer: | Daniel Mills |
Last Updated: | Dec 17, 2014 |
50560 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 50560\u003C/a\u003E - \u003Ca href=\"/Duane_Arnold\" title=\"Duane Arnold\"\u003EDuane Arnold\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ESecondary Containment Inoperable Due to Both Airlock Doors Open Simultaneously\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 50560 - Duane Arnold\n","link":"","lat":42.10089166666667,"lon":-91.77759444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Duane Arnold with 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
WEEKMONTHYEARENS 534962018-07-09T05:00:0009 July 2018 05:00:00
[Table view]10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 525112017-01-26T09:00:00026 January 2017 09:00:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Containment Valves Failed Surveillance Testing ENS 520532016-06-29T14:40:00029 June 2016 14:40:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 520222016-06-19T20:33:00019 June 2016 20:33:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 513532015-08-27T12:52:00027 August 2015 12:52:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 509892015-04-16T18:20:00016 April 2015 18:20:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Secondary Containment Airlock Doors Open Simultaneously ENS 509142015-03-21T05:30:00021 March 2015 05:30:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Secondary Containment Doors Opened Simultaneously ENS 505602014-10-23T06:07:00023 October 2014 06:07:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable Due to Both Airlock Doors Open Simultaneously ENS 503752014-08-15T17:18:00015 August 2014 17:18:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Standby Gas Treatment System Inoperable ENS 501532014-05-30T12:59:00030 May 2014 12:59:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Airlock Inoperable for 10 Seconds ENS 498382014-02-18T15:44:00018 February 2014 15:44:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Momentary Loss of Secondary Containment ENS 496572013-12-18T14:30:00018 December 2013 14:30:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Doors in Secondary Containment Airlock Opened Concurrently ENS 482122012-08-20T20:20:00020 August 2012 20:20:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Rwcu System Isolation Differential Flow - High Function Inoperable ENS 477092012-02-29T18:22:00029 February 2012 18:22:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Isolation Dampers Fail to Close During Quarterly Surveillance ENS 417852005-06-20T08:08:00020 June 2005 08:08:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Standby Gas Treatment Trains Briefly Inoperable During Testing 2018-07-09T05:00:00 | |