RS-16-248, Redacted Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems

From kanterella
Revision as of 22:35, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Redacted Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML17086A597
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 12/15/2016
From:
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML16357A264 List: ... further results
References
RS-16-248
Download: ML17086A597 (704)


Text

B/B-UFSAR 9.5-35 REVISION 9 - DECEMBER 2002 TABLE 9.5-1 COMMUNICATION SYSTEMS

TURBINE PEDESTAL AREAS LOCATION UNIT 1 Type - Public Address System E-12, K-15 Telephone K-12 Sound Powered Phone E-10 Turbine Building 451 ft UNIT 2 Type - Public Address System E-24 Telephone K-24 Sound Powered (Jack) E-26 Turbine Building 451 ft

MANUAL EMERGENCY BORATION VALVES UNIT 1 (1CV8439)

Type - Public Address System Q-17 Telephone U-17 Sound Powered (Jack) S-17 Aux. Bldg. Mezz.

426 ft and 439 ft UNIT 2 (2CV8439)

Type - Public Address System U-19 Telephone Q-19, U-19 Sound Powered (Jack) S21 Aux. Bldg. Mezz.

426 ft and 439 ft

SPENT FUEL POOL AREA Type - Public Address System Y21 Telephone Y21, Y15 Sound Powered (Jack) Y21 Fuel Handling Bldg. 426 ft. DIESEL GENERATORS Type - Unit 1 - A P7 Telephone P7 Sound Powered (Jack)

Type - Unit 1 - B N10 Telephone P10 Sound Powered (Jack)

Type - Unit 2 - A N26 Telephone N26 Sound Powered (Jack)

B/B-UFSAR 9.5-36 TABLE 9.5-1 (Cont'd)

TURBINE PEDESTAL AREAS LOCATION Type - Unit 2 - B N29 Telephone N29 Sound Powered (Jack)

Aux. Bldg. 401 ft AUXILIARY ELECTR ICAL EQUIPMENT ROOMS UNIT 1 Type - Telephone P11 Sound Powered (Jack)

N11 UNIT 2 Type - Public A ddress System N23 Sound Powered (Jack)

N23 Aux. Bldg. 451 ft 4-kV (ESF) SWITCHGEAR ROOMS UNIT 1 Type - Telephone L6, L8, P7, Sound Powered (Jack) P9, P6, P8 UNIT 2 Type - Telephone P29, P27, L30, Sound Powered (Jack)

L28, N28, N26 Aux. Bldg. Mezz. 426 ft & 439 ft RADWASTE EVAPORATOR CONTROL PANEL Type - Public Address System N25 Telephone N25 Sound Powered (Jack) N24 Aux. Bldg. 383 ft

SECONDARY SAMPLE ROOM Type - Public Address System D18 Telephone D18 Turb. Bldg. 401 ft PRIMARY SAMPLE ROOM Type - Public Address System L14 Sound Powered (Jack) M13 Telephone L14 Aux Bldg 401 ft

HYDROGEN AND STATOR COOLING PANELS UNIT 1 Type - Public A ddress System F4 Telephone E4 Sound Powered (Jack)

E4 B/B-UFSAR 9.5-37 REVISION 1 - DECEMBER 1989 TABLE 9.5-1 (Cont'd)

TURBINE PEDESTAL AREAS LOCATION UNIT 2 Type - Public Address System F32 Telephone E32 Sound Powered (Jack) E32 Turb. Bldg. Mezz.

426 ft

RELAY HOUSE Type - Public Address System Switchyard Telephone

B/B-UFSAR 9.5-38 REVISION 1 - DECEMBER 1989 TABLE 9.5-2 VITAL AREA LIGHTING NORMAL LIGHTING BACKUP LIGHTING 125-VDC LIGHTING REGULAR AC ESS. AND/OR LIGHTING LIGHTING BATTERY PACK Turbine Pedestal Areas Units 1 and 2 Yes No Yes Manual Emergency Boration Valves 1CV8439 and 2CV8439 Yes No No Spent Fuel Pool Areas Yes Yes No Diesel Generators Units 1 and 2 Yes Yes Yes Relay House Yes No No Auxiliary Electrical Equipment Room Units 1 and 2 Yes Yes Yes 4-kV (ESF) Switchgear Room Units 1 and 2 Yes Yes Yes Radwaste Evaporator Control Panel Area Yes Yes Yes Primary Sample Room (401') Yes Yes No Secondary Sample Panel (426') Yes No No H2 and Stator Cooling Panel Units 1 and 2 Yes No 1No

1 Battery pack located within 100 feet.

B/B-UFSAR REVISION 15 - DECEMBER 2014 Figures 9.1-7c through 9

.1-11 have been dele ted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002 Figure 9.1-22 has been deleted inten tionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.2-1 through 9.2-6 have been deleted intentionally.

B/B-UFSAR REVISION 16 - DECEMBER 2016 Figures 9.2-10 thru 9.2-14 have been deleted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002

Figures 9.2-15 through 9.2-27a have been deleted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.3-1 through 9.3-9 have been de leted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002

Figures 9.4-1 through 9.4-14 have been deleted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002

Figures 9.5-1 ha ve been deleted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002

Figure 9.5-3 has been deleted intentionally.

B/B-UFSAR REVISION 9 - DECEMBER 2002

Figures 9.5-5 through 9.5-7 have been delete d intentionally.