Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML15324A257
Person / Time
Site: Purdue University
Issue date: 11/20/2015
From: Montgomery C K
Division of Policy and Rulemaking
To: Alexander Adams
Division of Policy and Rulemaking
Uribe, Juan, NRR/JLD 415-3809
References
Download: ML15324A257 (8)


Text

DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCEWITHORDEREA 049ORDERCOMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTSEricEBowman Eric E. BowmanSpecial Advisor, Japan Lessons-Learned Division PurposeThe purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.

1.Revisionreflectslessonslearnedfrom 1.Revision reflects lessons learned from reviews and acceptable alternative

approachesComments must be submitted in writing in order to ensure that NRC will be able to properly consider them.

2 Availability for Comment*Federal Register Notice published November102015(80FR69703)

November 10, 2015 (80 FR 69703)*JLD-ISG-2012-01, Draft Revision 1 at ML15294A078*Comment period through December 10, 2015*www.regulations.

govdocket ID: NRC-gg2012-0068 3

Endorsement of Industry Guidance ithClifitidAdditi with Clarifications and AdditionsNEI 12-06

, "Diverse and Flexible Co ping ,pgStrategies (FLEX) Implementation Guide,"

Revision 1A, dated October 2015, ML15279A426 4

Reformatted to Align with DG-13011.Development and Implementation Process2.Equipment Capacity3.Reasonable Protection4.Equipment Maintenance 5ConfigurationControl 5.Configuration Control6.Treatment of Reevaluated HazardsGidfAP1000Di 7.Guidance for AP1000 Design5 NEI 12-06 New Elements*Resolution of generic concerns from reviewsreviews*Appendix E validation process 6

Mitigating Strategies Assessments*Addressing reevaluated seismic and floodinghazardsunderMarch122012 flooding hazards under March 12, 2012 request for informationFLEXdMdifidFLEX

-FLEX and Modified FLEX-Alternative Mitigating Strategies

-Targeted Hazard Mitigating Strategies 7

Mitigating Strategies Assessments, CtidContinued*Flooding-NEI12-06,AppendixG Flooding NEI 1206, Appendix G*Seismic -placeholder in NEI 12-06 for AppendixHwithsubstantialelementsin Appendix H with substantial elements in ISG 6.1 to solicit comments 8

DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCEWITHORDEREA 049ORDERCOMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTSEricEBowman Eric E. BowmanSpecial Advisor, Japan Lessons-Learned Division PurposeThe purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.

1.Revisionreflectslessonslearnedfrom 1.Revision reflects lessons learned from reviews and acceptable alternative

approachesComments must be submitted in writing in order to ensure that NRC will be able to properly consider them.

2 Availability for Comment*Federal Register Notice published November102015(80FR69703)

November 10, 2015 (80 FR 69703)*JLD-ISG-2012-01, Draft Revision 1 at ML15294A078*Comment period through December 10, 2015*www.regulations.

govdocket ID: NRC-gg2012-0068 3

Endorsement of Industry Guidance ithClifitidAdditi with Clarifications and AdditionsNEI 12-06

, "Diverse and Flexible Co ping ,pgStrategies (FLEX) Implementation Guide,"

Revision 1A, dated October 2015, ML15279A426 4

Reformatted to Align with DG-13011.Development and Implementation Process2.Equipment Capacity3.Reasonable Protection4.Equipment Maintenance 5ConfigurationControl 5.Configuration Control6.Treatment of Reevaluated HazardsGidfAP1000Di 7.Guidance for AP1000 Design5 NEI 12-06 New Elements*Resolution of generic concerns from reviewsreviews*Appendix E validation process 6

Mitigating Strategies Assessments*Addressing reevaluated seismic and floodinghazardsunderMarch122012 flooding hazards under March 12, 2012 request for informationFLEXdMdifidFLEX

-FLEX and Modified FLEX-Alternative Mitigating Strategies

-Targeted Hazard Mitigating Strategies 7

Mitigating Strategies Assessments, CtidContinued*Flooding-NEI12-06,AppendixG Flooding NEI 1206, Appendix G*Seismic -placeholder in NEI 12-06 for AppendixHwithsubstantialelementsin Appendix H with substantial elements in ISG 6.1 to solicit comments 8