ML15324A257
ML15324A257 | |
Person / Time | |
---|---|
Site: | Purdue University |
Issue date: | 11/20/2015 |
From: | Cindy Montgomery Division of Policy and Rulemaking |
To: | Alexander Adams Division of Policy and Rulemaking |
Uribe, Juan, NRR/JLD 415-3809 | |
References | |
Download: ML15324A257 (8) | |
Text
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E E. Bowman Special Advisor, Japan Lessons-Learned Division
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
- 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
2
Availability for Comment
- Federal Register Notice published November 10 10, 2015 (80 FR 69703)
- JLD-ISG-2012-01, Draft Revision 1 at ML15294A078
- Comment period through December 10, 2015 g g docket ID: NRC-
- www.regulations.gov 2012-0068 3
Endorsement of Industry Guidance with ith Clarifications Cl ifi ti andd Additions Additi NEI 12-06,, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4
Reformatted to Align with DG-1301
- 1. Development and Implementation Process
- 2. Equipment Capacity
- 3. Reasonable Protection
- 4. Equipment Maintenance 5
- 5. Configuration Control
- 6. Treatment of Reevaluated Hazards
- 7. G id Guidance ffor AP1000 D Design i
5
NEI 12-06 New Elements
- Resolution of generic concerns from reviews
- Appendix E validation process 6
Mitigating Strategies Assessments
- Addressing reevaluated seismic and flooding hazards under March 12 12, 2012 request for information
- FLEX and d Modified M difi d FLEX
- Alternative Mitigating Strategies
- Targeted Hazard Mitigating Strategies 7
Mitigating Strategies Assessments, C ti Continued d
- Flooding - NEI 12 12-06, 06, Appendix G
- Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in ISG §6.1 to solicit comments 8
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E E. Bowman Special Advisor, Japan Lessons-Learned Division
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
- 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
2
Availability for Comment
- Federal Register Notice published November 10 10, 2015 (80 FR 69703)
- JLD-ISG-2012-01, Draft Revision 1 at ML15294A078
- Comment period through December 10, 2015 g g docket ID: NRC-
- www.regulations.gov 2012-0068 3
Endorsement of Industry Guidance with ith Clarifications Cl ifi ti andd Additions Additi NEI 12-06,, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4
Reformatted to Align with DG-1301
- 1. Development and Implementation Process
- 2. Equipment Capacity
- 3. Reasonable Protection
- 4. Equipment Maintenance 5
- 5. Configuration Control
- 6. Treatment of Reevaluated Hazards
- 7. G id Guidance ffor AP1000 D Design i
5
NEI 12-06 New Elements
- Resolution of generic concerns from reviews
- Appendix E validation process 6
Mitigating Strategies Assessments
- Addressing reevaluated seismic and flooding hazards under March 12 12, 2012 request for information
- FLEX and d Modified M difi d FLEX
- Alternative Mitigating Strategies
- Targeted Hazard Mitigating Strategies 7
Mitigating Strategies Assessments, C ti Continued d
- Flooding - NEI 12 12-06, 06, Appendix G