ML15324A257

From kanterella
Jump to navigation Jump to search

"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.

Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML15324A257
Person / Time
Site: Purdue University
Issue date: 11/20/2015
From: Cindy Montgomery
Division of Policy and Rulemaking
To: Alexander Adams
Division of Policy and Rulemaking
Uribe, Juan, NRR/JLD 415-3809
References
Download: ML15324A257 (8)


Text

DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 ORDER COMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E Bowman Eric E. Bowman Special Advisor, Japan Lessons-Learned Division

Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.

1. Revision reflects lessons learned from
1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.

2

Availability for Comment

  • Federal Register Notice published November 10 2015 (80 FR 69703)

November 10, 2015 (80 FR 69703)

  • Comment period through December 10, 2015
  • www.regulations.gov docket ID: NRC-g g

2012-0068 3

Endorsement of Industry Guidance ith Cl ifi ti d Additi with Clarifications and Additions NEI 12-06, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4

Reformatted to Align with DG-1301

1. Development and Implementation Process
2. Equipment Capacity
3. Reasonable Protection
4. Equipment Maintenance 5 Configuration Control
5. Configuration Control
6. Treatment of Reevaluated Hazards G id f

AP1000 D i

7. Guidance for AP1000 Design 5

NEI 12-06 New Elements

  • Resolution of generic concerns from reviews reviews
  • Appendix E validation process 6

Mitigating Strategies Assessments

  • Addressing reevaluated seismic and flooding hazards under March 12 2012 flooding hazards under March 12, 2012 request for information FLEX d M difi d FLEX

- FLEX and Modified FLEX

- Alternative Mitigating Strategies

- Targeted Hazard Mitigating Strategies 7

Mitigating Strategies Assessments, C

ti d

Continued

  • Flooding - NEI 12-06, Appendix G Flooding NEI 12 06, Appendix G
  • Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in Appendix H with substantial elements in ISG §6.1 to solicit comments 8

DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 ORDER COMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E Bowman Eric E. Bowman Special Advisor, Japan Lessons-Learned Division

Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.

1. Revision reflects lessons learned from
1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.

2

Availability for Comment

  • Federal Register Notice published November 10 2015 (80 FR 69703)

November 10, 2015 (80 FR 69703)

  • Comment period through December 10, 2015
  • www.regulations.gov docket ID: NRC-g g

2012-0068 3

Endorsement of Industry Guidance ith Cl ifi ti d Additi with Clarifications and Additions NEI 12-06, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4

Reformatted to Align with DG-1301

1. Development and Implementation Process
2. Equipment Capacity
3. Reasonable Protection
4. Equipment Maintenance 5 Configuration Control
5. Configuration Control
6. Treatment of Reevaluated Hazards G id f

AP1000 D i

7. Guidance for AP1000 Design 5

NEI 12-06 New Elements

  • Resolution of generic concerns from reviews reviews
  • Appendix E validation process 6

Mitigating Strategies Assessments

  • Addressing reevaluated seismic and flooding hazards under March 12 2012 flooding hazards under March 12, 2012 request for information FLEX d M difi d FLEX

- FLEX and Modified FLEX

- Alternative Mitigating Strategies

- Targeted Hazard Mitigating Strategies 7

Mitigating Strategies Assessments, C

ti d

Continued

  • Flooding - NEI 12-06, Appendix G Flooding NEI 12 06, Appendix G
  • Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in Appendix H with substantial elements in ISG §6.1 to solicit comments 8