IR 05000335/2017005

From kanterella
Revision as of 14:23, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (IR 05000335/2017005 and 05000389/2017005)
ML17234A411
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/22/2017
From: Suggs L B
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2017005
Download: ML17234A411 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 22, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - (REPORT 05000335/201 7005 AND 05000389/201 7005)

Dear Mr. Nazar:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for St. Lucie Plant Unit 1 and Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

The NRC plans on conducting one non-routine inspection for Saint Lucie Unit 2 per IP 71003,

"Post Approval Site Inspection for License Renewal

," Phase II. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4539 with any questions you have regarding this letter.

Sincerely,/RA/

LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:

50-335, 50-389 License Nos.:

DPR-67, NPF-16

Enclosure:

St Lucie Inspection/Activity Plan (09/01/2017 - 06/30/201 9) cc: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - (REPORT 05000335/201 7005 AND 05000389/201 7005) August 22, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPassessment.Resource@nrc.gov ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No.

ML OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/16/2017 OFFICIAL RECORD

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSaint LucieInspection / Activity Plan 09/01/2017

-06/30/2019 Page 1 of 2 08/18/2017 14:57:54 LR-POST APPROVAL LR PHASE 2 (UNIT 2)

42 IPPost-Approval Site Inspection for License Renewal 7100308/28/2017 09/01/2017 2 IPPost-Approval Site Inspection for License Renewal 7100309/11/2017 09/15/2017OL RQ-REQUAL INSPECTION 21, 2 IPLicensed Operator Requalification Program7111111B10/16/2017 10/20/2017OL EXAM-INITIAL LICENSE EXAM PREP 41 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES V2349711/06/201711/10/2017OL EXAM-INITIAL LICENSE EXAM 41 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES V2349712/04/2017 12/22/2017 RP-RP PUBLIC INSPECTION 21, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/22/2018 01/26/2018 1, 2 IPRadiological Environmental Monitoring Program71124.0701/22/2018 01/26/2018 1, 2 IPOccupational Exposure Control Effectiveness71151-OR01 01/22/2018 01/26/2018 1, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 01/22/2018 01/26/2018 EP-EP EXERCISE 61, 2 IPExercise Evaluation711140102/12/2018 02/16/2018 1, 2 IPEmergency Action Level and Emergency Plan Changes711140402/12/2018 02/16/2018 1, 2 IPExercise Evaluation - Scenario Review711140802/12/2018 02/16/2018 1, 2 IPPerformance Indicator Verification7115102/12/2018 02/16/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P03/19/2018 03/23/2018 RP-RAD HAZARDS AND TRANSPORTATION 21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/19/2018 03/23/2018 1, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0803/19/2018 03/23/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P03/19/2018 03/23/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41, 2 IPProblem Identification and Resolution71152B05/07/201805/11/2018 1, 2 IPProblem Identification and Resolution71152B05/21/2018 05/25/2018 ISI-UNIT 2 IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P09/03/2018 09/07/2018 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P09/03/2018 09/07/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSaint LucieInspection / Activity Plan 09/01/2017

-06/30/2019 Page 2 of 2 08/18/2017 14:57:54 EP-EP PROGRAM INSPECTION 31, 2 IPAlert and Notification System Testing711140201/14/2019 01/18/2019 1, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/14/2019 01/18/2019 1, 2 IPEmergency Action Level and Emergency Plan Changes711140401/14/2019 01/18/2019 1, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/14/2019 01/18/2019 1, 2 IPPerformance Indicator Verification7115101/14/2019 01/18/2019DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAMS 61, 2 IPDesign Bases Assurance Inspection (Teams)7111121M01/14/2019 01/18/2019 1, 2 IPDesign Bases Assurance Inspection (Teams)7111121M02/11/2019 02/15/2019 1, 2 IPDesign Bases Assurance Inspection (Teams)7111121M03/04/2019 03/08/2019 TFPI-ST. LUCIE NFPA 805 31, 2 IPFire Protection - NFPA 805 (Triennial)7111105X06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.