ML17326A804
| ML17326A804 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/16/1980 |
| From: | SHALLER D V INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8101050356 | |
| Download: ML17326A804 (4) | |
Text
REGULATORY, FORMATION DISTRIBUTION SYM(RIDS)ACCESSION NBR:8101050356 DOC~DATE80/12/16NOTARIZED:
NODOCKETFACIL:50316DonaldC~CookNuclearPowerPlant~Unit2iIndiana805000316AUTHBYNAMEAUTHORAFFILIATION SHALIERiD>V.IndianaLMichiganElectricCo,RECIP~NAIVE'ECIPIKNTAFFILIATIONKEPPLERgJ
~G~Region3iChicagoiOfficeoftheDirectorSUBJECT!RO:on801215sprayheaderisolation valvesCTS120K8,CTS128Ewerediscovered sealed8lockedclosedat9<30h~Valvesreopenedrelocked8resealedincorrectposition~Followupreptwillbesubmitted by801226.DISTRIBUTION CODK:M007SCOPIESRECEIVED:LTR ENCISIZEiaTITLE:LER(Backfit)NOTES:Send 3copiesofallmaterialtoILE,05000316RECIPIENT IDCODE/NAME COPIESLTTRENCLRECIPIENT IDCODE/NAME COPIESLTTRENCLINTERNALS AKODI&K"EGFILEXTERNAL:
LPDR0Q02'103ASLBP/J~HARDMPAOPEXEVALBRNSICJANCl9atQTOTALNUMBEROFCOPIESREQUIRED:
LTTRENCL l'n1afI'IkillL4t,JI rtlOPIDOllflwcHa~INDIANA8rMICHIGANEIECTRICCOMPANYDONALDC.COOKNUCLEARPLANTP.O.Box468,Bridgman, Michigan49106(616)4654901December16,1980C7Vl1t'a<,jc,<<CC740Mr.J.G.Keppler,RegionalDirectorOfficeofInspection andEnforcement UnitedStatesNuclearRegulatory Commission RegionIII799Roosevelt RoadGlenEllyn,IL60137Operating LicenseDPR-74DocketNo.50-316
DearMr.Keppler:
ThisistoconfirmourverbalreporttoNRCRegionIIIInspector, Wi.E.Swanson,at0930hoursonDecember15,1980.Atthattimewereportedthatduringatourbeingperformed byaplantAuxiliary Equipment Opera-tor,itwasdiscovered thattwosprayheaderisolation valves(CTS-124E andCTS-128E),
locatedintheUnit2EastContainment HeatExchanger Room,weresealedandlockedclosed.Thiscondition wasimmediately reportedtotheShiftOperating Engineerwhodetermined thattheasfoundcondition wasincorrect.
Instructions weregiventoimmediately reopenthevalvesandrelockandresealtheminthecorrectposition.
Awrittenfollowupreportwillbesubmitted byDecember26,1980,asrequiredbyTechnical Specification Section6.9.1.8.Sincerely, D.V.ShallerPlantManager/babcc:J.E.DolanR.S.HunterR.W.Jurgensen R.F.KroegerR.W.KilburnE.Swanson/N.
DuBryNRCRO:IIIR.C.CallenMPSCG.Charnoff, Esq.J.M.HenniganW.LavalleEPRIPNSRCJ.F.StietzelE.L.TownleyDir.,MXPC(4copies)Dir.,IE(40copies)po>7I0
~t'P