ML17326B389
| ML17326B389 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/21/1988 |
| From: | ALEXICH M P INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | MURLEY T E NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR AEP:NRC:1047, GL-88-03, GL-88-3, TAC-M67230, TAC-M67231, NUDOCS 8806060134 | |
| Download: ML17326B389 (7) | |
Text
PCCEIERATED DIAIBUTION DEMONSTPZION SYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)pACCESSION NBR:8806060134 DOC.DATE:
88/05/21NOTARIZED-YESDOCKET,-,g FACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,Indiana&05000315"50-316DonaldC.CookNuclearPowerPlant,Unit2,Indiana&05000316AUTH.NAMEAUTHORAFFILIATION ALEXICH,M.P.
IndianaMichiganPowerCo.(formerly Indiana&MichiganEleRECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
DocumentControlBranch(Document ControlDesk)
SUBJECT:
RespondstoGenricLtr88-03,"Resolution ofGenericSafetyIssue93,SteamBindingofAuxiliary Feedwater Pumps."DISTRIBUTION CODE:A063DCOPIESRECEIVED:LTR 1ENCLlSIZE:9IPumNOTES:'ECIPIENT IDCODE/NAME PD3-1LASTANG,JINTERNAL:
ARM/DAF/LFMB NRR/DEST/PSB 8DNRR/DOEA11-E-4OGC15-B-18EXTERNAL:
LPDRNSICCOPIESLTTRENCL1011'01111101111RECIPIENT IDCODE/NAME PD3-1PDNRROLSHAN,LNRR/DEST/RSB 8E-ABSTRACT REGF01NRCPDR)COPIES'TTRENCL111111111111ADR'I,8ATOTALNUMBEROFCOPIESREQUIRED:
LTTR14ENCL11 lg IndianaMichiganPowerCompanyP.O.Box16631Coiumbus, OH43216AEP:NRC:1047 TACNo.M67230/M67231 DonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74RESPONSETONRCGENERICLETTER88-03;RESOLUTION OFGENERICSAFETYISSUE93,"STEAMBINDINGOFAUXILIARY FEEDWATER PUMPS"U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Attn:T.E.MurleyMay31,1988
DearDr.Murley:
ThisletterrespondstoNRCGenericLetter88-03,"Resolution ofGenericSafetyIssue93,SteamBindingofAuxiliary Feedwater Pumps."Thesubjectgenericletterrequestsaletterofconfirmation indicating that.theprocedures discussed inthegenericletterareinplaceandwillbemaintained.
TheOperations Department isrequiredbyprocedures 1-OHP4030.001.001 and2-OHP4030.001.001 toperformashiftly(every8hours)checkontheauxiliary feedwater (AFW)linestoverifytheAFWlinetemperature isambient.TheAFWlinesarecheckedatthepumpdischarges intheAFWpumpcorridorandattheAFWregulating valvesintheauxiliary building.
WhenAFWdirectedtoasteamgenerator isstoppedandthereactorcoolantsystemtemperature isincreasing, procedures requiretheOperations Department tochecktheAFWlinetemperature 30minutesand90minutesafterstoppingtheAFWpump.Procedures thatrequirethischeckare1-OHP4021.056.002, 2-OHP4021.056.002, 1-OHP4030.STP.017T, 2-OHP4030.STP.017T, 1-0HP4030.STP.017R, 2-OHP4030.STP.017R, and1-OHP4021.001.006.
Operations procedures 1-OHP4022.056.001 and2-0HP4022.056.001, "SteamBindinginAuxiliary FeedPumps"provideguidanceforrecognizing steambindingandforrestoring theAFWpumptooperablestatusifsteambindingweretooccur.Reference tothisgenericletterwillbeincorporated intotheaboveprocedures inthenextbiennialreviewtoassurethattheprocedures willbeSS060601$
4PDR4DOCKPSS053105000315DCD Dr.T.E.Murley-2-AEP:NRC:1047 maintained.
PertheNRC'srequest,wehaveestimated thestafftimerequiredtoresearchthisinformation andtomakethechangestoprocedures.
Weestimatethatthiswillrequire90manhours.Stafftimerequiredtopreparethisresponseisestimated tobe4manhours.Sincerely, M..exichVicePresident MPA/ehcc:D.H.Williams, Jr.W.G.Smith,Jr.-BridgmanR.C.CallenG.Bruchmann G.CharnoffNRCResidentInspector
-BridgmanA.B.Davis-RegionIII
~~
COUNTYOFFRANKLINMiltonP.Alexich,beingdulysworn,deposesandsaysthatheistheVicePresident oflicenseeIndianaMichiganPowerCompany,thathehasreadtheforgoingResponsetoNRCGenericLetter88-03,"Resolution ofGenericSafetyIssue93,SteamBindingofAuxiliary Feedwater Pumps,"andknowsthecontentsthereof;andthatsaidcontentsaretruetothebestofhisknowledge andbelief.Subscribed andsworntobeforemethisdayot'984INOTAKYbifiioilh A.Ai"I'LEGFI~iH NOIARYPUBI.IC-STALEOFOHIOIiIYCOMMISSION EXPIRESJAN.16,199035pugi) gilt>l4'I>iply