ML17334A462
| ML17334A462 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/25/1983 |
| From: | ALEXICH M P AMERICAN ELECTRIC POWER SERVICE CORP. |
| To: | DENTON H R Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323 | |
| Download: ML17334A462 (3) | |
Text
AMER1CAN-ELECTRIC POMfERServiceCorporation 2Broadway, NewYork,¹Y.10004(212)440-9000February25,1983AEP:NRC:0631B DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74NUREG-0737, ITEMII.F.1.6TECHNICAL SPECIFICATIOVi FEESPURSUANTTO10CFR170Mr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
DearMr.Denton:
InourletterNo.AEP:NRC:0631A, datedSeptember 29,1982,wesubmitted proposedAppendixATechnical Specification (T/S)changesrequiredforplacingthenewPost-Accident Containment HydrogenMonitoring System(PACRiS)intoservicetosatisfytherequirements ofNUREG-0737, ItemII.F.1.6~Our3.etterincludedastatement totheeffectthatthepaymentforthesechangeswouldbemadeaspartofthefeetobeleviedfortheissuanceoftheT/SchangesrequiredbyNUREG-0737.
However,bywayofhisFebruary3,1983,lettertoMr.JohnE.Dolan,Mr.WilliamO.Millerrequested theremittance of$4,400tocovertheNRCreviewexpenses.
Wewishtobringtoyourattention thatonFebruary15,1983,wereceivedGenericLetter82-16whichrequeststhesubmittal ofthirteenNUREG-0737-required T/Sconsolidated intoonesubmittal.
Furthermore, adraftGenericLettertransmitted byMr.DarrellG.EisenhuttoMr.CarlWalskeoftheAtomicIndustrial Forum,datedJanuary28,1983,requestssubmittal oftheT/S.required "fortheimplementation ofei'ghteen NUREG-0737 items,oneofwhichisitemII.F.1.6.
Mr.Eisenhut.'s letteragainrequeststhattheT/Schangesbeconsolidated'nto onesubmittal.
Theearlyimplementation of.ItemZI.F.1.6attheCookPlant,reflectsI&i%Co'sconcernforthesafeoperation oftheplantandthesafetyofthepublic.Byrequesting paymentforthisT/Schangeseparately, theNRCisfinancially penali"ing usfortheearlyimplementation ofrequiredsafetyequipment.
Consequently, werequestthatthepaymentfortheNUREG-0737, ItemZI.F.1.6T/SbemadepartofthesinglefeetobeleviedfortheissuanceoftheT/SchangesrequiredbyNUREG-0737.
Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.
Verytrulyyours,NilnP.exichAssistant VicePresident NuclearEngineering MPA/mdcc:JohnE.Dolan-ColumbusR.S.HunterR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffW.0.?Q.lier-NRCNRCResidentInspector atCookPlant-Bridgman A~"l'I(