ML17334A462

From kanterella
Revision as of 06:41, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
ML17334A462
Person / Time
Site: Cook  
Issue date: 02/25/1983
From: ALEXICH M P
AMERICAN ELECTRIC POWER SERVICE CORP.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323
Download: ML17334A462 (3)


Text

AMER1CAN-ELECTRIC POMfERServiceCorporation 2Broadway, NewYork,¹Y.10004(212)440-9000February25,1983AEP:NRC:0631B DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74NUREG-0737, ITEMII.F.1.6TECHNICAL SPECIFICATIOVi FEESPURSUANTTO10CFR170Mr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555

DearMr.Denton:

InourletterNo.AEP:NRC:0631A, datedSeptember 29,1982,wesubmitted proposedAppendixATechnical Specification (T/S)changesrequiredforplacingthenewPost-Accident Containment HydrogenMonitoring System(PACRiS)intoservicetosatisfytherequirements ofNUREG-0737, ItemII.F.1.6~Our3.etterincludedastatement totheeffectthatthepaymentforthesechangeswouldbemadeaspartofthefeetobeleviedfortheissuanceoftheT/SchangesrequiredbyNUREG-0737.

However,bywayofhisFebruary3,1983,lettertoMr.JohnE.Dolan,Mr.WilliamO.Millerrequested theremittance of$4,400tocovertheNRCreviewexpenses.

Wewishtobringtoyourattention thatonFebruary15,1983,wereceivedGenericLetter82-16whichrequeststhesubmittal ofthirteenNUREG-0737-required T/Sconsolidated intoonesubmittal.

Furthermore, adraftGenericLettertransmitted byMr.DarrellG.EisenhuttoMr.CarlWalskeoftheAtomicIndustrial Forum,datedJanuary28,1983,requestssubmittal oftheT/S.required "fortheimplementation ofei'ghteen NUREG-0737 items,oneofwhichisitemII.F.1.6.

Mr.Eisenhut.'s letteragainrequeststhattheT/Schangesbeconsolidated'nto onesubmittal.

Theearlyimplementation of.ItemZI.F.1.6attheCookPlant,reflectsI&i%Co'sconcernforthesafeoperation oftheplantandthesafetyofthepublic.Byrequesting paymentforthisT/Schangeseparately, theNRCisfinancially penali"ing usfortheearlyimplementation ofrequiredsafetyequipment.

Consequently, werequestthatthepaymentfortheNUREG-0737, ItemZI.F.1.6T/SbemadepartofthesinglefeetobeleviedfortheissuanceoftheT/SchangesrequiredbyNUREG-0737.

Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.

Verytrulyyours,NilnP.exichAssistant VicePresident NuclearEngineering MPA/mdcc:JohnE.Dolan-ColumbusR.S.HunterR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffW.0.?Q.lier-NRCNRCResidentInspector atCookPlant-Bridgman A~"l'I(