Text
AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
In our letter No. AEP:NRC:0631A, dated September 29,
- 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.
However, by way of his February 3, 1983, letter to Mr.
John E. Dolan, Mr. William O. Miller requested the remittance of
$4,400 to cover the NRC review expenses.
We wish to bring to your attention that on February 15,
- 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.
Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.
Carl Walske of the Atomic Industrial Forum, dated January 28,
- 1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.
Mr.
Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.
The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.
By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Nil n P.
exich Assistant Vice President Nuclear Engineering MPA/md cc:
John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman