ML14143A040
ML14143A040 | |
Person / Time | |
---|---|
Site: | West Valley Demonstration Project, P00M-032 |
Issue date: | 05/28/2014 |
From: | Glenn C J NRC/FSME/DWMEP/DURLD/MDB |
To: | |
Shared Package | |
ML14143A059 | List: |
References | |
Download: ML14143A040 (11) | |
Text
Commission's Final Policy Statement onWestValleyDemonstrationProjecton West Valley Demonstration ProjectPresentation at the West Valley Quarterly Public MeetingMay 28, 2014Chad Glenn1 Policy Statement TopicsypWVDP Decommissioning CriteriagLicense Termination Rule (LTR)Decommissioning of West ValleyApplication of LTR to WVDPNRC-Licensed Disposal Area (NDA) andS(S)State-Licensed Disposal Area (SDA)Decommissioning Criteria for License CSF-1(NRCSiteLicense)(NRC Site License)Incidental WastePreviousAuthorizedBurialsPrevious Authorized BurialsEnvironmental Analysis2 WVDP Decommissioning CriteriaLicenseTerminationRule(LTR)asLicense Termination Rule (LTR) as Decommissioning CriterionLTR Criterion Applies to:oHigh Level Waste (HLW) Tanksg()oFacilities Used in Solidification of WasteoMaterial and HardwareCriteria for Incidental Waste3 Decommissioning of West ValleyCldUiSitComplex and Unique SiteDecommissioned to Extent Technically and Economically Feasibley4 The Application of LTR to WVDPTwo Step Process:NRC Prescribes the LTREvaluate if Preferred Alternative Satisfies Criteria after Completion of EIS5 NRC-License Disposal Area (NDA) and State-LicenseDisposalArea(SDA)State-License Disposal Area (SDA)LTR Applies to NDANDAPidUiChllNDA Provides Unique ChallengesEIS Analysis of Impacts Beyond 1,000 YearsSDA Regulated by State of New YorkgyCooperative Approach with State should be Utilized6 Decommissioning Criteria for License CSF-1(NRCSiteLicense)CSF-1 (NRC Site License)LTR Criteria Applies to Termination of NYSERDA'sLicenseNYSERDAs LicenseAny Exemption or Alternate Criteria Also Applies to NYSERDA7 Incidental WasteEarlyResolutionofCriteriaisImportantEarly Resolution of Criteria is ImportantIncidental Waste Criteria:ProcesstoRemoveKeyRadionuclidestoMaximumProcess to Remove Key Radionuclides to Maximum Extent Technically and Economically PracticalManage so that the Safety Requirements Comparable tthPfObjtifPt61SbtCto the Performance Objectives of Part 61, Subpart C, are SatisfiedResultingCalculatedDosesIntegratedwithallResulting Calculated Doses Integrated with all Other Calculated DosesEIStoConsiderImpactsofIncidentalWasteEIS to Consider Impacts of Incidental Waste8 Previous Authorized BurialsAnalysis of Site-Specific Impacts and CostsGeneral Exemption Provisions of Part 20 AvailableCNDA Contains Buried Radioactive MaterialEIStoEvaluateDispositionofPreviousBurialsEIS to Evaluate Disposition of Previous Burials9 Environmental AnalysisyLTR Does Not Establish New RequirementsSitSifiDiiiDiiSite-Specific Decommissioning DecisionEvaluateVariousAlternativesEvaluate Various AlternativesNRC Will Rely on Decommissioning EISFull or Partial License Termination Requires an Environmental Review10 NRC Roles and ResponsibilitiesAtomic Energy Act (AEA)West Valley Demonstration Project Act (WVDPA)()National Environmental Policy Act (NEPA)InterfacewithStakeholdersInterface with Stakeholders11