~AEROTEST OPERATIONS, INC.3455 FOSTORIA WAY
- SAN RAMON, CA 94583 *(925) 866-1212
- FAX (925) 866-171627 July 2015Director of Inspection and EnforcementU.S. Nuclear Regulatory CommissionWashington, D.C. 20555
Subject:
Annual Summary of Changes, Tests and Experiments at AerotestRadiography and Research Reactor (ARRR), Docket no. 50-228, for theperiod of 1 July 2014 to 30 June 2015.Gentlemen:The enclosed report summarizes the ARRR operations from July 1, 2014 through June30, 2015. This submittal complies with the requirements set forth in 10 CFR 50.59,"Authorization of Changes, Tests and Experiments."In order to comply with NRC requirements to resolve foreign ownership issues, AerotestOperations voluntarily ceased reactor operations on Oct. 15, 2010 and remainedshutdown pending transfer of ownership to a U.S. company. As such, summary forms ofmonthly operations and unscheduled power reductions are not applicable and aretherefore not included in this report.On July 24, 2013 the NRC issued a denial of license renewal, denial of license transferand an order to modify the Aerotest Operations facility operating license no. R-98 toprohibit operations of the ARRR. Aerotest is appealing the decision.Sincerely,Alfredo W. MerenReactor SupervisorAerotest Operations, Inc.*A subsidiary of Autoliv ASP, INC.
ANNUAL SUMMARY OF CHANGES, TESTS AND EXPERIMENTSPERFORMED AT THEAEROTEST RADIOGRAPHY AND RESEARCH REACTOR(ARRR)DOCKET NO. 50-228FOR THE PERIOD ENDING JUNE 30, 2015BYALFREDO W. MERENREACTOR SUPERVISORAPPROVED BYSANDRA L. WARRENGENERAL MANAGERAEROTEST OPERATIONS, INC.
SECTION 1Part 1 -Changes1. The two steel holdup tanks designated to hold any water that runs out of the reactorsystem were replaced with polyethylene tanks due to significant rusting andcorrosion.Part 2 -ExperimentsNo experiments were performed during the year while the reactor remained shutdown.