Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr) for the Period of July 1, 2014 to June 30, 2015
ML15218A032
Person / Time
Site: Aerotest
Issue date: 07/27/2015
From: Meren A
Aerotest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15218A032 (3)


Text

~AEROTEST OPERATIONS, INC.

3455 FOSTORIA WAY

  • SAN RAMON, CA 94583 *(925) 866-1212
  • FAX (925) 866-1716 27 July 2015 Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period of 1 July 2014 to 30 June 2015.

Gentlemen:

The enclosed report summarizes the ARRR operations from July 1, 2014 through June 30, 2015. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests and Experiments."

In order to comply with NRC requirements to resolve foreign ownership issues, Aerotest Operations voluntarily ceased reactor operations on Oct. 15, 2010 and remained shutdown pending transfer of ownership to a U.S. company. As such, summary forms of monthly operations and unscheduled power reductions are not applicable and are therefore not included in this report.

On July 24, 2013 the NRC issued a denial of license renewal, denial of license transfer and an order to modify the Aerotest Operations facility operating license no. R-98 to prohibit operations of the ARRR. Aerotest is appealing the decision.

Sincerely, Alfredo W. Meren Reactor Supervisor Aerotest Operations, Inc.

  • A subsidiary of Autoliv ASP, INC.

ANNUAL

SUMMARY

OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR)

DOCKET NO. 50-228 FOR THE PERIOD ENDING JUNE 30, 2015 BY ALFREDO W. MEREN REACTOR SUPERVISOR APPROVED BY SANDRA L. WARREN GENERAL MANAGER AEROTEST OPERATIONS, INC.

SECTION 1 Part 1 - Changes

1. The two steel holdup tanks designated to hold any water that runs out of the reactor system were replaced with polyethylene tanks due to significant rusting and corrosion.

Part 2 - Experiments No experiments were performed during the year while the reactor remained shutdown.