ML15324A257
ML15324A257 | |
Person / Time | |
---|---|
Site: | Purdue University |
Issue date: | 11/20/2015 |
From: | Montgomery C K Division of Policy and Rulemaking |
To: | Alexander Adams Division of Policy and Rulemaking |
Uribe, Juan, NRR/JLD 415-3809 | |
References | |
Download: ML15324A257 (8) | |
Text
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCEWITHORDEREA-12-049ORDERCOMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTSEricEBowmanEric E. BowmanSpecial Advisor, Japan Lessons-Learned Division PurposeThe purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.1.Revisionreflectslessonslearnedfrom1.Revision reflects lessons learned from reviews and acceptable alternative approachesComments must be submitted in writing in order to ensure that NRC will be able to properly consider them.2 Availability for Comment*Federal Register Notice published November102015(80FR69703)November 10, 2015 (80 FR 69703)*JLD-ISG-2012-01, Draft Revision 1 at ML15294A078*Comment period through December 10, 2015*www.regulations.govdocket ID: NRC-gg2012-00683 Endorsement of Industry Guidance ithClifitidAdditiwith Clarifications and AdditionsNEI 12-06, "Diverse and Flexible Coping ,pgStrategies (FLEX) Implementation Guide," Revision 1A, dated October 2015, ML15279A4264 Reformatted to Align with DG-13011.Development and Implementation Process2.Equipment Capacity3.Reasonable Protection4.Equipment Maintenance5ConfigurationControl5.Configuration Control6.Treatment of Reevaluated HazardsGidfAP1000Di7.Guidance for AP1000 Design5 NEI 12-06 New Elements*Resolution of generic concerns from reviewsreviews*Appendix E validation process6 Mitigating Strategies Assessments*Addressing reevaluated seismic and floodinghazardsunderMarch122012flooding hazards under March 12, 2012 request for informationFLEXdMdifidFLEX-FLEX and Modified FLEX-Alternative Mitigating Strategies-Targeted Hazard Mitigating Strategies7 Mitigating Strategies Assessments, CtidContinued*Flooding-NEI12-06,AppendixGFlooding NEI 1206, Appendix G*Seismic -placeholder in NEI 12-06 for AppendixHwithsubstantialelementsinAppendix H with substantial elements in ISG 6.1 to solicit comments8 DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCEWITHORDEREA-12-049ORDERCOMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTSEricEBowmanEric E. BowmanSpecial Advisor, Japan Lessons-Learned Division PurposeThe purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.1.Revisionreflectslessonslearnedfrom1.Revision reflects lessons learned from reviews and acceptable alternative approachesComments must be submitted in writing in order to ensure that NRC will be able to properly consider them.2 Availability for Comment*Federal Register Notice published November102015(80FR69703)November 10, 2015 (80 FR 69703)*JLD-ISG-2012-01, Draft Revision 1 at ML15294A078*Comment period through December 10, 2015*www.regulations.govdocket ID: NRC-gg2012-00683 Endorsement of Industry Guidance ithClifitidAdditiwith Clarifications and AdditionsNEI 12-06, "Diverse and Flexible Coping ,pgStrategies (FLEX) Implementation Guide," Revision 1A, dated October 2015, ML15279A4264 Reformatted to Align with DG-13011.Development and Implementation Process2.Equipment Capacity3.Reasonable Protection4.Equipment Maintenance5ConfigurationControl5.Configuration Control6.Treatment of Reevaluated HazardsGidfAP1000Di7.Guidance for AP1000 Design5 NEI 12-06 New Elements*Resolution of generic concerns from reviewsreviews*Appendix E validation process6 Mitigating Strategies Assessments*Addressing reevaluated seismic and floodinghazardsunderMarch122012flooding hazards under March 12, 2012 request for informationFLEXdMdifidFLEX-FLEX and Modified FLEX-Alternative Mitigating Strategies-Targeted Hazard Mitigating Strategies7 Mitigating Strategies Assessments, CtidContinued*Flooding-NEI12-06,AppendixGFlooding NEI 1206, Appendix G*Seismic -placeholder in NEI 12-06 for AppendixHwithsubstantialelementsinAppendix H with substantial elements in ISG 6.1 to solicit comments8