10 CFR Part 50.48(b)(1) required that all nuclear power plants licensed to operate prior to January 1, 1979, must satisfy the applicable requirements of
10 CFR Part 50, Appendix R, Sections III.G.2 or III.G.3. Contrary to the above, since November 1985, the licensee has not met the requirements of
10 CFR Part 50, Appendix R, Sections III.G.2 or III.G.3, in that the licensee failed to provided adequate protection of cables and equipment of redundant trains of systems necessary to achieve and maintain hot shutdown conditions located in the same fire area by either (a) a 3-hour rated
fire barrier; (b) 20 feet of spatial separation with detection and suppression installed in the fire area; or (c) a 1-hour rated
fire barrier with detection and suppression installed in the fire area; or by providing alternative shutdown capability for the areas where adequate cable protection was not provided. This violation was determined to be of very low safety significance (Green) based on the results of the
IMC 0609, Appendix F, Fire Protection
Significance Determination Process, Phase III Quantitative Screening Approach. This violation was documented in the licensees
CAP as CRs 687178, 688543, 687173, and 692904