Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch
ML15357A042
Person / Time
Site: Hatch, North Anna, Diablo Canyon, Robinson  Duke Energy icon.png
Issue date: 12/18/2015
From: Troutner J
Curtiss-Wright Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15357A042 (6)


Text

12/18/2015PaoD 1Part 21 (PAR) Event#. 51611Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)Supplier: QUALTECH NP Event Date/ITime: 10/06/2015 (EST)Last Modification: 12/18/2015Region: 3 Docket #:City: CINCINNATI Agreement State: YesCounty: License #:State: OHNRC Notified by: MARGIE HOVER Notifications: LADONNA SUGGS R2DOHQ Ops Officer: DONG HWA PARK RAY AZUA R4DOEmergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL10 CFR Section:21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCEPOTENTIAL PART 21 INVOLVING A200 SERIES STARTERSThe following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200series starter failures since September 15, 2008. The failures would remain in the operated/energized contactstate with power removed for some period of time. All starters impacted with this failure were continuouslyenergized. The concern was that if tripped, that the main contacts would not open to protect the motor."Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. TheTest Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNPdetermined that the Cutler Uammer A200 series starter failures may be reportable and an extent of conditionreview needed to be done."The root cause was a silicon based mold release that remained on the molded parts and would come betweenthe moving (magnet) & fixed armatures. When heated for an extended period of time, this material would becomesticky causing anywhere from a minor delay in opening, up to a frozen closed condition."Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facilityin May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon basedmold release was periodically used until October 2012. According to Cutler Hammer, anything made after January1, 2013 should definitely be silicon mold release free."Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012could have this concern. This failure has only been reported for continuously energized applications. The end user 12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2should evaluate their applications for this potential failure mechanism."QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.

CUR TISS -DOUETcoNTRACTWRIGHT TRANSMENTTALNQualTech NP, Nuclear Division TRNM TACurtiss-Wright Corporation QTP40P.O. NUMBER4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/AT: 513.528.7900 I F: 513.528.4537TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUSU.S. REGULATORY COMMISSION1. For Approval A. Approved-Released forWASHINGTON, DC 20555-0001 2. Final Documents for ConstructionATTN: HEADQUARTERS OPERATIONS OFFICER Record B. Approved as noted-hoo.hoc@nrc.gov 3. For Information Only Resubmit- ConstructionPhone: (301) 816-5100; Fax: (301) 816-5151 4. For Preliminary Use may proceed_____________________________________ 5. For Your Use C. Not approved- ResubmitPROJECT: ______________________ 6. Revised as Requested D. _______NO. NO. LI DRAWINGS El REPORTS EDOUET FOF El SPECIFICATION El PROCEDUREEDRAWING NUMBER REV. PRINTS/ SEPIAS [] OTHERNCOPIESNDN/A N/A INOTIFICATION OF 10CFR PART 21 ON 2EATON/CUTLER HAMMER A200 SERIES STARTERS______ ______(& CONTACTORS)4 4. 4. +4 4. 4. +4 4. 4. 4.4 4. 4. 4.4 4. 4. 4.4. 4. 4. 4.______ 4. 4.4. 4. 4.PLEASE ACKNOWLEDGE RECEIPT BELOW ANDREMARKS ________________________ RETURN A SIGNED COPY____ ____ ___ ____ ____ ___ ____ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _DATED ________________BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015DOCUMENT CONTROL In order to avoid delays in the projectPAGE: 1 of 1 these documents must be returned by:______\1020-07-91, REV.4 CURTI7SS -CriswihWRIGHT Nuclear OvsoQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.7900!] F: 513.528.9292http://qua/technp.cwfc.ctomDecember 18, 2015

Subject:

Notification of 1OCFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&Contactors)Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler HammerA200 series starter failures since September 15, 2008. The failures would remain in theoperated/energized contact state with power removed for some period of time. All startersimpacted with this failure were continuously energized. The concern was that if tripped, thatthe main contacts would not open to protect the motor.Testing was performed by Eaton Industrial Controls Division after receiving defective samplesfrom PGE. The Test Report fr'om Eaton was received by QTNP for further review andevaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starterfailures may be reportable and an extent of condition review needed to be done.The root cause was a silicon based mold release that remained on the molded parts and wouldcome between the moving (magnet) & fixed armatures. When heated for an extended period oftime, this material would become sticky causing anywhere from a minor delay in opening, up toa frozen closed condition.Cutler Hammer has determined that the silicone mold release was first introduced into themanufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that wastraditionally used. The silicon based mold release was periodically used until October 2012.According to Cutler Hammer, anything made after January 1, 2013 should definitely be siliconmold release free.Thus any starters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 could have this concern. This failure has only been reported forcontinuously energized applications. The end user should evaluate their applications for thispotential failure mechanism.Corrective Action to Prevent recurrence:*QualTech has notified all of the affected customers listed in the attached table regardingthis issue.*QualTech will revise applicable dedication plans to add a caution that "Anystarters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 may not be dedicated and are unacceptable". Or similar languageand provide a reference to this notification or Corrective Action document that applies tothis notification.Page l of 2 Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176.Sincerely,General Manager,Curtiss-Wright QualTech, NP

.CUR TISS -WRIGHTCurtiss-WrightNucdear DivisionQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.79001I F: 513.528.9292hftp://quaftechnp.cwfc.comCustomer Plant Customer Year /C'#RlyQy Tg S/N / Date________ PO#: sold/shipped CC/J/#_elaQyag CodeDominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C 08011801-02:012011103:C120 116H.B.ROBISON04: C111230Duke H.OI ON00607524 2/16/2012 CC 1262/CJ1521 A20TKIKCA 8 01152101 05:C110909PLANT 06:0C11091407:C0111111____ ___ ___ ____ ___ ___ ____ _ _ ___ ____ __ ___08:C0111128Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909DuePLANT 00056 32/02 019/155 AOKO J551 03-06:011091502: 0090323KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 012092801:0C100603"02: C100617PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C10070104-07:C0101,208__________ ___ ___ ___ _ __ _ _ ___ ___ 08-09: Cl110111PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 10719PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429PG&EDIABLO CANYON350C1842462"9/29/2009T9421IELA200MOCACDEJ42,T942 10201:C09082602:009092301-06:C090831--I0 120627Date Code is:YYMMDDPage 2 of 2 12/18/2015PaoD 1Part 21 (PAR) Event#. 51611Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)Supplier: QUALTECH NP Event Date/ITime: 10/06/2015 (EST)Last Modification: 12/18/2015Region: 3 Docket #:City: CINCINNATI Agreement State: YesCounty: License #:State: OHNRC Notified by: MARGIE HOVER Notifications: LADONNA SUGGS R2DOHQ Ops Officer: DONG HWA PARK RAY AZUA R4DOEmergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL10 CFR Section:21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCEPOTENTIAL PART 21 INVOLVING A200 SERIES STARTERSThe following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200series starter failures since September 15, 2008. The failures would remain in the operated/energized contactstate with power removed for some period of time. All starters impacted with this failure were continuouslyenergized. The concern was that if tripped, that the main contacts would not open to protect the motor."Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. TheTest Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNPdetermined that the Cutler Uammer A200 series starter failures may be reportable and an extent of conditionreview needed to be done."The root cause was a silicon based mold release that remained on the molded parts and would come betweenthe moving (magnet) & fixed armatures. When heated for an extended period of time, this material would becomesticky causing anywhere from a minor delay in opening, up to a frozen closed condition."Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facilityin May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon basedmold release was periodically used until October 2012. According to Cutler Hammer, anything made after January1, 2013 should definitely be silicon mold release free."Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012could have this concern. This failure has only been reported for continuously energized applications. The end user 12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2should evaluate their applications for this potential failure mechanism."QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.

CUR TISS -DOUETcoNTRACTWRIGHT TRANSMENTTALNQualTech NP, Nuclear Division TRNM TACurtiss-Wright Corporation QTP40P.O. NUMBER4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/AT: 513.528.7900 I F: 513.528.4537TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUSU.S. REGULATORY COMMISSION1. For Approval A. Approved-Released forWASHINGTON, DC 20555-0001 2. Final Documents for ConstructionATTN: HEADQUARTERS OPERATIONS OFFICER Record B. Approved as noted-hoo.hoc@nrc.gov 3. For Information Only Resubmit- ConstructionPhone: (301) 816-5100; Fax: (301) 816-5151 4. For Preliminary Use may proceed_____________________________________ 5. For Your Use C. Not approved- ResubmitPROJECT: ______________________ 6. Revised as Requested D. _______NO. NO. LI DRAWINGS El REPORTS EDOUET FOF El SPECIFICATION El PROCEDUREEDRAWING NUMBER REV. PRINTS/ SEPIAS [] OTHERNCOPIESNDN/A N/A INOTIFICATION OF 10CFR PART 21 ON 2EATON/CUTLER HAMMER A200 SERIES STARTERS______ ______(& CONTACTORS)4 4. 4. +4 4. 4. +4 4. 4. 4.4 4. 4. 4.4 4. 4. 4.4. 4. 4. 4.______ 4. 4.4. 4. 4.PLEASE ACKNOWLEDGE RECEIPT BELOW ANDREMARKS ________________________ RETURN A SIGNED COPY____ ____ ___ ____ ____ ___ ____ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _DATED ________________BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015DOCUMENT CONTROL In order to avoid delays in the projectPAGE: 1 of 1 these documents must be returned by:______\1020-07-91, REV.4 CURTI7SS -CriswihWRIGHT Nuclear OvsoQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.7900!] F: 513.528.9292http://qua/technp.cwfc.ctomDecember 18, 2015

Subject:

Notification of 1OCFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&Contactors)Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler HammerA200 series starter failures since September 15, 2008. The failures would remain in theoperated/energized contact state with power removed for some period of time. All startersimpacted with this failure were continuously energized. The concern was that if tripped, thatthe main contacts would not open to protect the motor.Testing was performed by Eaton Industrial Controls Division after receiving defective samplesfrom PGE. The Test Report fr'om Eaton was received by QTNP for further review andevaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starterfailures may be reportable and an extent of condition review needed to be done.The root cause was a silicon based mold release that remained on the molded parts and wouldcome between the moving (magnet) & fixed armatures. When heated for an extended period oftime, this material would become sticky causing anywhere from a minor delay in opening, up toa frozen closed condition.Cutler Hammer has determined that the silicone mold release was first introduced into themanufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that wastraditionally used. The silicon based mold release was periodically used until October 2012.According to Cutler Hammer, anything made after January 1, 2013 should definitely be siliconmold release free.Thus any starters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 could have this concern. This failure has only been reported forcontinuously energized applications. The end user should evaluate their applications for thispotential failure mechanism.Corrective Action to Prevent recurrence:*QualTech has notified all of the affected customers listed in the attached table regardingthis issue.*QualTech will revise applicable dedication plans to add a caution that "Anystarters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 may not be dedicated and are unacceptable". Or similar languageand provide a reference to this notification or Corrective Action document that applies tothis notification.Page l of 2 Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176.Sincerely,General Manager,Curtiss-Wright QualTech, NP

.CUR TISS -WRIGHTCurtiss-WrightNucdear DivisionQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.79001I F: 513.528.9292hftp://quaftechnp.cwfc.comCustomer Plant Customer Year /C'#RlyQy Tg S/N / Date________ PO#: sold/shipped CC/J/#_elaQyag CodeDominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C 08011801-02:012011103:C120 116H.B.ROBISON04: C111230Duke H.OI ON00607524 2/16/2012 CC 1262/CJ1521 A20TKIKCA 8 01152101 05:C110909PLANT 06:0C11091407:C0111111____ ___ ___ ____ ___ ___ ____ _ _ ___ ____ __ ___08:C0111128Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909DuePLANT 00056 32/02 019/155 AOKO J551 03-06:011091502: 0090323KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 012092801:0C100603"02: C100617PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C10070104-07:C0101,208__________ ___ ___ ___ _ __ _ _ ___ ___ 08-09: Cl110111PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 10719PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429PG&EDIABLO CANYON350C1842462"9/29/2009T9421IELA200MOCACDEJ42,T942 10201:C09082602:009092301-06:C090831--I0 120627Date Code is:YYMMDDPage 2 of 2