ML003760469
From kanterella
Revision as of 19:41, 6 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML003760469 | |
Person / Time | |
---|---|
Issue date: | 10/25/2000 |
From: | Office of Nuclear Reactor Regulation |
To: | |
Magruder S L, NRR/DRIP/RGEB, 415-3139 | |
References | |
DG-1093, SECY-00-0212 RG-1.186 | |
Download: ML003760469 (5) | |
Similar Documents from Office of Nuclear Reactor Regulation | |
---|---|
Category:Regulatory Guide
MONTHYEARML22276A1542022-10-0303 October 2022
[Table view]Some use of "" in your query was not closed by a matching "".Pre-decisional DG Seismic Isolation Ver 7 ML22276A1492022-10-0303 October 2022 Pre-decisional DG Seismic Design Ver 7 ML22157A3662022-05-27027 May 2022 Draft NRC Regulatory Issue Summary 2022-XX Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants ML21280A3592021-10-26026 October 2021 Watermarked for ACRS - RG 1.244 - Control of Heavy Loads -10-7.docx ML20287A1992021-01-31031 January 2021 Regulatory Guide (RG) 1.191, Rev 1, Fire Protection Program for Nuclear Power Plants During Decommissioning ML20287A4232021-01-31031 January 2021 Draft Regulatory Guide DG-1377, Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste ML20142A4892020-08-31031 August 2020 DG-1351 Rev 1 - Licensee Actions to Address Nonconservative Technical Specifications_FY20 ML20078K9272020-08-0606 August 2020 FRN for DG-1370 for Revision 1 of RG 1.191 Fire Protection Program for Nuclear Power Plants During Decommissioning and Permanent Shutdown ML19291D4372019-10-17017 October 2019 RITF Public Meeting Talking Points on Regulatory Guide Reviews (October 17, 2019) Regulatory Guide 1.2262019-06-30030 June 2019 Rev. 0, Flexible Mitigation Strategies for Beyond-Design-Basis Events Regulatory Guide 1.2272019-06-30030 June 2019 Rev. 0, Wide-Range Spent Fuel Pool Level Instrumentation ML18129A0802018-06-30030 June 2018 Draft Regulatory Guide (DG)-1336, Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. ML16312A0022017-08-0202 August 2017 Rulemaking: Final Rule: Office of Management and Budget Supporting Statement for Information Collections American Society of Mechanical Engineers Code Cases ML15294A4902017-03-10010 March 2017 Rulemaking: Being Made Public to Support the Regulatory Information Conference - Draft Preliminary Regulatory Basis - Regulatory Improvements for Power Reactors Transitioning to Decommissioning ML16035A4762017-02-28028 February 2017 Draft Regulatory Guide (DG)-2004, Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities ML16211A1672016-11-30030 November 2016 Rev. 0 - Wide-Range Spent Fuel Pool Level Instrumentation Dated November 2016 ML16218A2362016-11-30030 November 2016 Rev. 0 - Integrated Response Capabilities for Beyond-Design-Basis Events Dated November 2016 SECY-16-0048, : Enclosure 3 - Proposed Rulemaking: Non-Power Production or Utilization Facility License Renewal (RIN-350-AI96)2016-04-0707 April 2016 SECY-16-0048: Enclosure 3 - Proposed Rulemaking: Non-Power Production or Utilization Facility License Renewal (RIN-350-AI96) ML16005A1332016-01-19019 January 2016 2/4/2016 ACRS Subcommittee Meeting: Regulatory Guide 1 224 - Establishing Analytical Limits for Zirconium-Alloy Cladding Material ML16005A1342016-01-19019 January 2016 2/4/2016 ACRS Subcommittee Meeting: Regulatory Guide 1.223 - Determining Post Quench Ductility ML16005A1352016-01-19019 January 2016 2/4/2016 ACRS Subcommittee Meeting: Regulatory Guide 1.222 - Measuring Breakaway Oxidation Behavior ML15259A4722015-09-16016 September 2015 Results of Periodic Review of Regulatory Guide 8.35 ML15068A3282015-03-10010 March 2015 ACRS Pre-Decisional DG-1319 Integrated Response Capabilities for Beyond-Design-Basis Events ML15068A3252015-03-10010 March 2015 ACRS Pre-Decisional DG-1317, Wide Range Spent Fuel Pool Level Instrumentation SECY-11-0124, Station Blackout Mitigation Strategies, Final Regulatory Basis - Revision 32013-07-17017 July 2013 Station Blackout Mitigation Strategies, Final Regulatory Basis - Revision 3 ML1104201332011-04-30030 April 2011 Regulatory Analysis, Revision 4 of Regulatory Guide 1.149, Nuclear Power Plant Simulation Facilities for Use in Operator Training, License Examinations, and Applicant Experience Requirements ML1034000082011-01-31031 January 2011 Draft Regulatory Guide, DG-1229, Assuring the Availability of Funds for Decommissioning Nuclear Reactors ML0909705302009-09-30030 September 2009 Draft Regulatory Guide DG-1225, Instrument Lines Penetrating the Primary Reactor Containment ML0916204092009-07-31031 July 2009 DG-4015, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications ML0812005932008-04-10010 April 2008 Enclosure 9 - Proposed Guidance to MC0305 to Address Protracted PI Results - NEI, Draft ML0808801432008-03-27027 March 2008 Nesc Reference for the Purpose of TMI License Renewal Environmental Review ML0625404082006-10-11011 October 2006 Draft Regulatory Guide DG-1164, Meteorological Monitoring Programs for Nuclear Power Plants (Proposed Revision 1 of Regulatory Guide 1.23) ML0615202332006-05-29029 May 2006 DG-1145 Section C.I.1 Introduction on and General Description of Plant Regulatory Guide 1.12005-09-0606 September 2005 Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal System Pumps ML0424600382004-11-0808 November 2004 SECY-040-0211Atch2 - Regulatory Guide 1.101, Revision 5 ML0413400872004-06-30030 June 2004 SECY-04-0109 - Attachment 6 - Regulatory Guide 1.201, Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to Their Safety Significance ML0320305282003-06-23023 June 2003 Debris Generation Methodology Guidance, Draft Guide, Attachment 3 ML0320305352003-06-21021 June 2003 PWR Sump Performance Evaluation Methodology: Velocity Calculation, Draft, Attachment 4 ML0037671122000-11-0707 November 2000 Guide for Processing License Amendments ML0037681442000-11-0101 November 2000 G20000453/LTR-00-0600 - Enclosure to Rep. Sue Kelly Policy on Request for Additional Information When Processing License Amendments ML0037604692000-10-25025 October 2000 SECY-00-0212-Attachment 1 - Regulatory Guide 1.186 - Guidance and Examples for Idenfitying 10 CFR 50.2 Design Bases ML0037360972000-08-24024 August 2000 Draft Regulatory Guide DG-1104, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses ML0734102491978-03-0707 March 1978 Transmittal of Revision 1 to Regulatory Guide 1.97, a Clearer Basis for Development Initial Response ML0124202911976-01-0707 January 1976 License Amendment, Reporting Requirements According to Regulatory Guides 1.10 and 1.16 ML0127703911976-01-0707 January 1976 Amendments 14, Incorporating Technical Specifications Changes to the Reporting Requirements ML0119300121975-12-22022 December 1975 Letter Informing of Issuance of Amendment No. 16, Technical Specification Change No.26 for License No DPR-38 ML0133304361975-11-26026 November 1975 Issuance of Amendments 13 and 12, Incorporating Into Turkey Point Nuclear Generating Units 3 and 4 TS Changes to Reporting Requirements ML0118700651975-11-0101 November 1975 License DPR-35, Amendment 13 ML19283D5761971-03-10010 March 1971 Safety Guide 8 (Regulatory Guide 1.8) Personnel Selection and Training 2022-05-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML003760469&oldid=581210"