ML26048A318

From kanterella
Revision as of 22:00, 21 February 2026 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Reactor Allegations by Cy Received: January 2022 - 2026
ML26048A318
Person / Time
Issue date: 02/18/2026
From: Sandra Mendez
NRC/OE
To:
References
Download: ML26048A318 (0)


Text

  • This table refers to allegations from all sources external to the NRC.

REACTOR ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 Arkansas Nuclear One 7

5 4

5 Beaver Valley 2

2 4

Braidwood 2

2 5

1 Browns Ferry 1

3 3

Brunswick 6

2 Byron 1

1 4

2 Callaway 2

2 2

Calvert Cliffs 2

2 Catawba 5

2 2

Clinton 2

2 3

2 Columbia Generating Station 11 13 6

8 Comanche Peak 1

2 1

Cooper 2

2 Crane Clean Energy Center 1

1 D.C. Cook 4

4 1

Davis-Besse 3

2 5

Diablo Canyon 3

6 2

1 Dresden 1

2 Farley 1

9 3

3 Fermi 3

5 5

1 FitzPatrick 1

3 1

1 Ginna 3

3 2

1 Grand Gulf 5

4 1

4 Harris 1

6 6

2 Hatch 2

6 1

7 LaSalle 3

4 Limerick 4

2 4

2 McGuire 6

1 2

Millstone 3

1 2

2 Monticello 2

Nine Mile Point 2

2 3

1 North Anna 1

2 Oconee 3

3 2

1

  • This table refers to allegations from all sources external to the NRC.

REACTOR ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 Palisades 1

1 3

9 1

Palo Verde 7

5 1

2 Peach Bottom 2

1 Perry 1

2 1

Point Beach 1

1 5

3 Prairie Island 1

1 Quad Cities 1

3 11 4

River Bend 1

10 3

5 Robinson 1

1 1

Saint Lucie 5

4 21 3

Salem/Hope Creek 4

5 3

6 Seabrook 1

1 Sequoyah 3

5 8

5 South Texas Project 15 3

1 5

1 Summer 3

2 1

2 Surry 1

3 1

5 Susquehanna 5

3 3

1 Turkey Point 3

10 6

5 Vogtle 7

4 1

Vogtle AP 1000 29 9

5 4

Waterford 3

4 4

4 Watts Bar 7

12 5

3 Wolf Creek 3

2 3

5 1

  • This table refers to allegations from all sources external to the NRC.

NON-OP REACTOR ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 Big Rock Point 1

Crystal River 1

4 2

erraPower - Molten Chloride Fast Reactor (MCFR 1

Fort Calhoun 3

2 1

GE-EVESR 1

Hope Creek 2 1

Indian Point 3

4 3

Kewaunee 1

Oyster Creek 5

1 Pilgrim 2

2 2

San Onofre 1

1 2

Three Mile Island 2 2

3 Wilmington, NC 1

Yankee-Rowe 1

Zion 1

  • This table refers to allegations from all sources external to the NRC.

FUEL FACILITY ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 BWXT Nuclear Operations Group, Inc.

3 1

Framatome, Inc.

1 2

2 Global Nuclear Fuel - Americas, LLC 3

3 3

Louisiana Energy Services, LLC 2

3 1

4 Nuclear Fuel Services, Inc.

4 4

5 Solstice Advanced Materials US, Inc.

1 2

6

  • This table refers to allegations from all sources external to the NRC.
  • This table refers to allegations from all sources external to the NRC.